Retrieving RFP details
Release
Close
City of West Carrollton
The Work includes process improvements and asset replacements for several of the sand filtration facility assets. This Project includes process, high service pump, structural, HVAC and electrical improvements at the sand filtration plant. It also includes SCADA upgrades at the membrane facility and the addition of a generator and automatic transfer switch.
City of Lexington
The furnishing, and construction work at the existing water treatment plant including the installation of filter under drains, new media, air scour system, piping, values, electrical, and all other appurtenances as shown and specified in the construction documents.
Morehead Utility Plant Board
Work includes demolition of the existing water treatment plant and related appurtenances.
South Central Connecticut Regional Water Authority
The project includes installation of a lined drying bed at the west river water treatment plant, inclusive of an underdrain system to collect leachate. A pump station is will be installed to collect drying bed leachate and precipitation and pump it up to the existing lagoons. Further, a force main connecting the pump station to the lagoon influent piping will be installed, along with lagoon desludging pumps in each lagoon.
Release
Oct 09, 2025
Close
Nov 18, 2025