Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Perry, KS (Owner) is soliciting bids for Water System Improvements consisting of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters. A pre-bid conference is scheduled for 2025-12-22 at 2:30 PM at Perry City Hall, and bids will be accepted until 2026-01-06 at 10:00 AM. The project is publicly bid (Invitation for Bid); bidders must register on the planroom site to order/ download contract documents and submit questions to the Engineer (Abby Mills).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Perry, KS (Owner) seeks bids for the Sanitary Sewer Collection System Improvements project (Solicitation #23-1362L) which includes point repairs, CIPP/fold & form liner, isolated service tap repair, and manhole rehabilitation. A pre-bid conference is scheduled for 2025-12-22 at 2:00 PM at Perry City Hall and bids are due on 2026-01-06 at 10:00 AM. Contract documents and drawings are available via the ProjectBids portal (registration required).
Posted Date
Dec 4, 2025
Due Date
Jan 6, 2026
Release: Dec 4, 2025
Close: Jan 6, 2026
The City of Perry, KS (Owner) seeks bids for the Sanitary Sewer Collection System Improvements project (Solicitation #23-1362L) which includes point repairs, CIPP/fold & form liner, isolated service tap repair, and manhole rehabilitation. A pre-bid conference is scheduled for 2025-12-22 at 2:00 PM at Perry City Hall and bids are due on 2026-01-06 at 10:00 AM. Contract documents and drawings are available via the ProjectBids portal (registration required).
Premium
Access the largest public sector contact database
Project consists of water system improvements.
Posted Date
Nov 30, 2025
Due Date
Dec 19, 2025
Release: Nov 30, 2025
Close: Dec 19, 2025
Project consists of water system improvements.
AvailableWater system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
Posted Date
Nov 17, 2025
Due Date
Dec 17, 2025
Release: Nov 17, 2025
Close: Dec 17, 2025
Water system improvements including recoating and restoration of the interior and exterior of the existing 300,000-gallon ground storage tank and appurtenances. Replacement of two (2) existing high service pumps and all valves, piping, electrical and associated appurtenances at the pump station. Upsize of approx. 700 LF of existing 10" waterline to 12" water line and all valves and associated appurtenances.
AvailableProject consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Project consists of replacing a significant portion of the water distribution system including water mains, valves, hydrants, and service meters.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis