Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Granby
Contract 1: construction of approx. 71,000 LF of renewal water lines in various locations. The lines will generally consist of PVC class 200 pipes ranging in size from 8" down to 2" pipe along with all necessary fittings, valves, and fire and flush hydrants and all final cleanup and site restoration. Work will also include the renewal of up to approx. 600 associated service line connections and up to approx. 300 associated new water meter sets. Work will also include the installation of a standby electrical generator set at the location of the existing system well #2. contract 2: construction of a new 200,000-gal. elevated spheroid welded steel water storage tank with an overflow height of approx. 99'. The tower will be installed on the site of the existing well #2. Work to include all necessary foundations, steel fabrication and erection, painting, and final disinfection of the new tank.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Melvin
Water system improvements. Installation of approx. 4,000 LF of 6" PVC water line, valves, hydrants and appurtenances.
Posted Date
Oct 21, 2025
Due Date
Nov 20, 2025
Release: Oct 21, 2025
Town of Melvin
Close: Nov 20, 2025
Water system improvements. Installation of approx. 4,000 LF of 6" PVC water line, valves, hydrants and appurtenances.
AvailableMilburn Water District
Milburn Water District is soliciting sealed bids for water system improvements in Carlisle County, Kentucky. Bids are due December 1, 2025, and the solicitation is active and non-federal.
Posted Date
-
Due Date
Dec 1, 2025
Milburn Water District
Close: Dec 1, 2025
Milburn Water District is soliciting sealed bids for water system improvements in Carlisle County, Kentucky. Bids are due December 1, 2025, and the solicitation is active and non-federal.
AvailableCity of Ellisville
The City of Ellisville seeks proposals for water system improvements under the MCWI program, funded by the ARPA Mississippi Municipality and County Water Infrastructure Grant Program. The project involves compliance with specific federal and state regulations, and the award will be based on the lowest qualified bid.
Posted Date
-
Due Date
Dec 3, 2025
Release: -
City of Ellisville
Close: Dec 3, 2025
The City of Ellisville seeks proposals for water system improvements under the MCWI program, funded by the ARPA Mississippi Municipality and County Water Infrastructure Grant Program. The project involves compliance with specific federal and state regulations, and the award will be based on the lowest qualified bid.
AvailableVillage of Fort Edward
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 β General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 β Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Posted Date
Oct 29, 2025
Due Date
Dec 4, 2025
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Release: Oct 29, 2025
Village of Fort Edward
Close: Dec 4, 2025
Water system improvements: replacement of water storage tank & upgrade to booster pump station: Contract 1 β General Construction: Furnish and install a new 200,000-gallon nominal pedesphere water storage tank, including but not limited to: site preparation and grading; installation of the concrete tank foundation; furnishing and installing inlet/outlet piping and a new water main to the tank; installation of a tank mixer, level transducer, cathodic protection system, lightning protection system, tank accessories and appurtenances, construction of a gravel access road, chain link fence and gate, and all associated site improvements. The tank shall be filled, disinfected, and tested in accordance with project specifications. Following successful commissioning of the new tank, the existing water storage tank shall be decommissioned and demolished as part of this contract. Work also includes modifications and upgrades to the existing booster pump station (excluding electrical work); Contract 2 β Electrical Construction: Furnish and install all electrical work associated with the new 200,000-gallon pedesphere water storage tank and modifications to the existing booster pump station. Work includes, but is not limited to: electrical service to tank, electrical conduits and wiring for tank mixer, level transducer, cathodic protection system, lightning protection system, and exterior and interior tank lighting; electrical connections and modifications associated with booster pump station upgrades; integration of SCADA control components and instrumentation for remote monitoring and control of the new tank and booster pump station; coordination with General construction Contractor for equipment installation; and all testing, calibration, and commissioning required to deliver a fully functional and integrated electrical and control system.
Available