Verandah Mud
Provide paving improvements.
St. Charles Parish
Project is intended to clean, and strengthen where necessary, the existing drainage canal that runs adjacent to primrose drive. The existing canal has become overgrown with vegetation and has exerienced bank failures and erosion at various locations along its length. The canal will be strengthened by sheet pile walls and cleaned where applicable. In addition to the above-mentioned sheet pile work the drainage pump station near the interesection of lagatutta drive and primrose drive discharge lines will be rerouted
Town of Mount Carmel
Work includes bringing secondary clarifier number 1 back into service by replacing the effluent launders, installing a full radius skimmer and beach, upgrading piping and valves, replacing the drive cage, trussarms/ flights, suction arm, center pier, influent well, skimmer and scumtrough, weirs and baffles, and necessary appurtenances. The project also includes upgraded pumps and controls to the plant drainage pump station, new piping that connects pdps and eq basin and will be upsized to 6", valves, and electrical and instrumentation upgrades. The last part of the project includes replacement of existing blowers to meet current and projected plant demands. Additional work includes miscellaneous work in the yard piping, site grading, minor concrete repair, secondary clarifier dredging and cleaning, and other support facilities.
Rondout Valley Central School District
2025 Capital Improvement Project, Phase 1B - Mechanical.
Release
Oct 19, 2025
Close
Nov 04, 2025