Retrieving RFP details
Release
Close
Town of Mount Carmel
Work includes bringing secondary clarifier number 1 back into service by replacing the effluent launders, installing a full radius skimmer and beach, upgrading piping and valves, replacing the drive cage, trussarms/ flights, suction arm, center pier, influent well, skimmer and scumtrough, weirs and baffles, and necessary appurtenances. The project also includes upgraded pumps and controls to the plant drainage pump station, new piping that connects pdps and eq basin and will be upsized to 6", valves, and electrical and instrumentation upgrades. The last part of the project includes replacement of existing blowers to meet current and projected plant demands. Additional work includes miscellaneous work in the yard piping, site grading, minor concrete repair, secondary clarifier dredging and cleaning, and other support facilities.
City of Alamo
Project consists of the rehabilitation of two (2) clarifiers at the city water treatment plant. The scope of work includes sandblasting, surface preparation, and re-coating of interior and exterior surface of one clarifier, and the replacement of select mechanical components associated with both clarifiers.
Southern Water And Sewer District
Water treatment plant improvements.
Town of Bruceton
Project consists of replacing the existing high service pumps at the water treatment plant and providing SCADA and chlorine and turbidity monitoring capability.
City of Vinton
Construction of the water treatment plant improvements project. The project consists of the construction of a new water treatment plant structure, aerators, clearwells, booster pumps, horizontal pressure filters, chemical feed equipment, piping, sitework, electrical and controls, and related work as shown on the drawings and within the specifications.
Release
Sep 05, 2025
Close
Oct 31, 2025