Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Florida School for the Deaf and the Blind
Refurbishment should include High Jump, Discus, Shot Put Course, Long Jump Runway, Triple Jump Runway, Javelin Runway, and potential excavation. Install Soil Erosion Measures, as required by the local Governing Soil Conservation District. Remove and dispose of approximately 1 ½“ thick asphalt. Enlarge the existing High Jump Footprint to 50’ x 100’. Excavating around old footprint and install 6” thick fine dense graded aggregate (DGA). Installation of long jump runway, 160 foot long, 5 foot wide with jump pit for rubber surface and install concrete ribbon curb edge with NEW 6”x12” on Long Jump footprint. Provide sand for landing pits and install concrete ribbon curb edge with NEW 6”x12” on Sand Pit footprint. Construct 2” hot mix asphalt (HMA) 19 mm slab base course for high and long jump. Install 2” thick hot mix asphalt (HMA) SP 9.5 mm for asphalt course javelin runway.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Cutler Jewish Day School
Work includes to install impact resistant doors, gates, fencing and a surveillance camera system.
Posted Date
Sep 29, 2025
Due Date
Dec 18, 2025
Release: Sep 29, 2025
Cutler Jewish Day School
Close: Dec 18, 2025
Work includes to install impact resistant doors, gates, fencing and a surveillance camera system.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Florida School for the Deaf and the Blind
Refurbishment should include set radius points, track surface, curbing, asphalt, polyurethane track surface, stripping and markings. 1 check to set radius points as needed, if not 400 meters, extra work may be needed; 2. Install soil erosion measures, as required by the local governing soil conservation district; 3. Mill the existing running track surface. See attached file for full scope.
Posted Date
Oct 14, 2025
Due Date
Jan 6, 2026
Release: Oct 14, 2025
Florida School for the Deaf and the Blind
Close: Jan 6, 2026
Refurbishment should include set radius points, track surface, curbing, asphalt, polyurethane track surface, stripping and markings. 1 check to set radius points as needed, if not 400 meters, extra work may be needed; 2. Install soil erosion measures, as required by the local governing soil conservation district; 3. Mill the existing running track surface. See attached file for full scope.
AvailableSoutheast Wisconsin Professional Baseball Park District
Work includes renovations to the existing Helfaer Field including replacement of fencing and installing a synthetic turf field where the grass field sits currently.
Posted Date
Nov 13, 2025
Due Date
Dec 8, 2025
Release: Nov 13, 2025
Southeast Wisconsin Professional Baseball Park District
Close: Dec 8, 2025
Work includes renovations to the existing Helfaer Field including replacement of fencing and installing a synthetic turf field where the grass field sits currently.
Town of Old Lyme
Provide athletic field and lawn maintenance services.
Posted Date
Nov 26, 2025
Due Date
Dec 19, 2025
Release: Nov 26, 2025
Town of Old Lyme
Close: Dec 19, 2025
Provide athletic field and lawn maintenance services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →