Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
SFLC Procurement Branch 2(00085)
The requirement is for the USCG Cutter WAESHE (WMSL 751) Dockside Repairs during Fiscal Year (FY)26 Fiscal Quarter (FQ)3.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
U.S. Coast Guard
Repair contract for uscgc crocodile fy26 dockside maintenance availabiltiy designed to complete all standard recurring maintenance items: watertight closures, main diesel engine assemlies, electrical power distribution system, thermographic inspection, ventilation system, engine room supply and exhaust fan assemblies, grey water holding tanks, and cleaning/inspecting sewage holding tanks.
Posted Date
Nov 5, 2025
Due Date
Dec 3, 2025
Release: Nov 5, 2025
U.S. Coast Guard
Close: Dec 3, 2025
Repair contract for uscgc crocodile fy26 dockside maintenance availabiltiy designed to complete all standard recurring maintenance items: watertight closures, main diesel engine assemlies, electrical power distribution system, thermographic inspection, ventilation system, engine room supply and exhaust fan assemblies, grey water holding tanks, and cleaning/inspecting sewage holding tanks.
AvailableU.S. Coast Guard
Repair contract for uscgc isaac mayo fy26 dockside maintenance availability designed to complete all standard recurring maintenance items: gaylor hood ventilation system, interior wet deck coverings, fuel filter manifold, port main diesel engine and stand-off pipe hanger.
Posted Date
Nov 12, 2025
Due Date
Dec 12, 2025
Release: Nov 12, 2025
U.S. Coast Guard
Close: Dec 12, 2025
Repair contract for uscgc isaac mayo fy26 dockside maintenance availability designed to complete all standard recurring maintenance items: gaylor hood ventilation system, interior wet deck coverings, fuel filter manifold, port main diesel engine and stand-off pipe hanger.
AvailableSFLC Procurement Branch 2(00085)
Perform the dockside of the USCGC MUNRO.
Posted Date
Sep 25, 2025
Due Date
Dec 1, 2025
Release: Sep 25, 2025
SFLC Procurement Branch 2(00085)
Close: Dec 1, 2025
Perform the dockside of the USCGC MUNRO.
AvailableSFLC Procurement Branch 2(00085)
Perform various drydock repairs of the USCGC MALLET (WLIC 75304.
Posted Date
Nov 13, 2025
Due Date
Dec 10, 2025
Release: Nov 13, 2025
SFLC Procurement Branch 2(00085)
Close: Dec 10, 2025
Perform various drydock repairs of the USCGC MALLET (WLIC 75304.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis