Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The U.S. Coast Guard (USCG) is soliciting contractor services to inspect, groom, calibrate, and verify the Machinery Plant Control - Monitoring System (MPC-MS) aboard the Cutter STURGEON BAY to support operational readiness. Work includes full-system inspection of MPC-MS hardware, PLCs, HMIs and sensors, grooming tasks (reseating connectors, tightening terminations, correcting wiring), calibration with traceable equipment, firmware updates, testing, and delivery of written reports and calibration certificates. The work is for a defined POP (place of performance) period in January 2026 and includes coordination with the Engineer Petty Officer and specific completion criteria.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide contractor services to inspect, groom, and verify proper operation of the Machinery Plant Control – Monitoring System (MPC-MS) aboard Coast Guard Cutter. 140-ft Icebreaking Tug.
Posted Date
Dec 9, 2025
Due Date
Dec 15, 2025
Release: Dec 9, 2025
Close: Dec 15, 2025
Provide contractor services to inspect, groom, and verify proper operation of the Machinery Plant Control – Monitoring System (MPC-MS) aboard Coast Guard Cutter. 140-ft Icebreaking Tug.
Premium
Access the largest public sector contact database
The U.S. Coast Guard (Surface Force Logistics Center) issued a combined synopsis/solicitation (RFQ 70Z08526Q0000855) requesting HI-FOG certified contractor services to perform 5-year and annual inspection, testing, and any needed minor corrections of the Hi-Fog Water Mist Fire Suppression System aboard USCGC STURGEON BAY. The contractor must supply listed replacement parts (pneumatic/hydraulic repair kits, hoses, filters, valve rebuild kits) and return the system to normal operation after testing. The period of performance is 22 Dec 2025 — 29 Dec 2025 and the notice is a small-business set-aside firm-fixed-price procurement.
Posted Date
Dec 11, 2025
Due Date
Dec 29, 2025
Release: Dec 11, 2025
Close: Dec 29, 2025
The U.S. Coast Guard (Surface Force Logistics Center) issued a combined synopsis/solicitation (RFQ 70Z08526Q0000855) requesting HI-FOG certified contractor services to perform 5-year and annual inspection, testing, and any needed minor corrections of the Hi-Fog Water Mist Fire Suppression System aboard USCGC STURGEON BAY. The contractor must supply listed replacement parts (pneumatic/hydraulic repair kits, hoses, filters, valve rebuild kits) and return the system to normal operation after testing. The period of performance is 22 Dec 2025 — 29 Dec 2025 and the notice is a small-business set-aside firm-fixed-price procurement.
AvailableComplete blasting and painting of the USCGC Kanawha components.
Posted Date
Dec 11, 2025
Due Date
Jan 9, 2026
Release: Dec 11, 2025
Close: Jan 9, 2026
Complete blasting and painting of the USCGC Kanawha components.
AvailableCleaning of the exhaust system onboard the USCGC Kanawha.
Posted Date
Dec 10, 2025
Due Date
Jan 9, 2026
Release: Dec 10, 2025
Close: Jan 9, 2026
Cleaning of the exhaust system onboard the USCGC Kanawha.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis