Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The purchase of repair and airflow velocity balancing services on 12 chemical fume hoods. The repairs and air flow balancing of the 12 chemical fume hoods shall ensure the fume hoods will pass the airflow velocity balance certification that will be completed by the Government as the inspection of services rendered prior to acceptance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide ductless fume hood.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Provide ductless fume hood.
AvailableHanford Laboratory Management and Integration, LLC (HLMI), dba Navarro-ATL, issued a Sources Sought (HLMI-2506204) to identify parties interested in providing a Ductless Fume Hood in support of the 222-S Laboratory at the Hanford Site. The notice is market research to solicit capability statements or information, not a grant program. Responses are due Dec 15, 2025 at 7:00 p.m. EST.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
Close: Dec 16, 2025
Hanford Laboratory Management and Integration, LLC (HLMI), dba Navarro-ATL, issued a Sources Sought (HLMI-2506204) to identify parties interested in providing a Ductless Fume Hood in support of the 222-S Laboratory at the Hanford Site. The notice is market research to solicit capability statements or information, not a grant program. Responses are due Dec 15, 2025 at 7:00 p.m. EST.
AvailableThe project includes modifications to existing casework, mechanical, plumbing, and electrical systems to accommodate a new laboratory fume hood. Work includes laboratory fume hoods; plumbing; HVAC; electrical.
Posted Date
Dec 10, 2025
Due Date
Jan 7, 2026
Release: Dec 10, 2025
Close: Jan 7, 2026
The project includes modifications to existing casework, mechanical, plumbing, and electrical systems to accommodate a new laboratory fume hood. Work includes laboratory fume hoods; plumbing; HVAC; electrical.
AvailableSupply bench-top ductless fume hood(s) rated for Class IB flammable liquids (e.g., acetone, methanol, n-hexane). Key requirements: NFPA 45 (2024) compliance for chemical fume hoods; SEFA 9 DH III / UL 1805 or Navarro-approved standard; max dimensions ~26" depth × 50" width × ≤54" height (4'-4" desired); continuous exhaust even with face closed; minimum airflow 50 cfm, airflow sensor and alarm; two identical chemical adsorbent filter layers with chemical sensor between layers meeting/exceeding ANSI/AIHA Z9.5 and a filter-breakthrough alarm; spill containment ≥2 L; interior limited-combustible materials; listed by a nationally recognized testing lab for Class IB use; provide ASHRAE 110 (2016) acceptance test procedure, maintenance/spare parts list, sensor calibration or replaceable sensor, timeline, capabilities, and registrations (SAM UEI and Hanford Vendor Registration).
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Supply bench-top ductless fume hood(s) rated for Class IB flammable liquids (e.g., acetone, methanol, n-hexane). Key requirements: NFPA 45 (2024) compliance for chemical fume hoods; SEFA 9 DH III / UL 1805 or Navarro-approved standard; max dimensions ~26" depth × 50" width × ≤54" height (4'-4" desired); continuous exhaust even with face closed; minimum airflow 50 cfm, airflow sensor and alarm; two identical chemical adsorbent filter layers with chemical sensor between layers meeting/exceeding ANSI/AIHA Z9.5 and a filter-breakthrough alarm; spill containment ≥2 L; interior limited-combustible materials; listed by a nationally recognized testing lab for Class IB use; provide ASHRAE 110 (2016) acceptance test procedure, maintenance/spare parts list, sensor calibration or replaceable sensor, timeline, capabilities, and registrations (SAM UEI and Hanford Vendor Registration).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis