Retrieving RFP details
Release
Close
University Of Rhode Island
Seeking a vendor for the demolition and replacement of the existing stadium east grandstands and entry plaza. This project will replace the existing east grandstands, storage buildings, and press box with a new NCAA Div 1 grandstand facility, entry plaza, team amenities, and ADA access. Project consists of the construction of a new 5,000-seat grandstand with a press box served by an elevator and egress stair tower. Multiple restrooms, utility rooms, and storage rooms are provided in a building under the grandstand on a new concourse foundation with stormwater storage and containment systems. A new entry plaza extends to the corner of the site with site improvements for fencing, seating, landscaping, lighting, and paving. Additionally, modifications to the northwest corner of the field with retaining walls and an additional turf area. See attached file.
URI Meade Stadium Renovation (RFQ)
zip
Augusta Colonial Theater
Provide renovation of the existing stage and other miscellaneous items.
Rose Bowl Operating Company
The Project includes demolition of existing stadium facilities and construction of a new multi-level South End Zone Club structure with structural concrete, structural steel, MEP systems, glazing, millwork, roofing, finishes, and related improvements. Subcontractors in the following trades are required to prequalify to be eligible to bid: Structural Steel, Electrical, HVAC, Plumbing, Drywall & Framing, Finish Carpentry / Millwork, Glazing, Roofing & Waterproofing, Demolition & Abatement, and Fire Protection.
Kansas State University
Renovation of former USPS offices and surrounding work areas to create a new office suite. The project includes constructing a new wall system to establish a dedicated records area within the main lobby, as well as reconfiguring existing office and conference spaces with new partitions, finishes, and mechanical upgrades.
Release
Sep 12, 2025
Close
Oct 31, 2025