City of Leesburg
Provide all necessary labor, equipment, tools, materials, supplies, and incidentals to replace 1,000 (LF) of existing 12-inch water line and 8" sewer line with 14" HDPE water line and 14-inch HDPE sewer line.
City of Leesburg
Provide all necessary labor, equipment, tools, supplies, and incidentals to abandon and install approximately 1,500 feet of 6" steel natural gas main.
Tatamy Borough Sewer Authority
Street Sewer Relocation Project. The project consists of the installation of (1) Sanitary Sewer Manhole, 146 LF of 8" SDR-26, reconstruction of (2) existing laterals, connecting to existing Sanitary Sewer Manhole and the removal/abandonment of the existing sewer system as described in the contract documents. This work includes incidental construction, Pavement restoration and grass restoration.
City of Granbury
Project consists of constructing approx 3,584 LF of proposed water line, mainly consisting of 12" dia but also including some 8" and 20" diameter lines. Approx 359 LF of that is proposed by boring. Project also includes approx 1,582 LF of proposed pvc gravity sewer line, consisting of 10" and 12" diameter lines. Approx 276 LF of that is proposed by boring.