Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Clinton County (NY) is soliciting bids for the Treadwell Mills–Military Turnpike Corridor Pedestrian & Bicycle Improvements Project in the Town of Plattsburgh. Work includes installation/replacement of roughly 6,400 feet of sidewalk, new crosswalks, bike lanes via lane reallocation, pavement rehabilitation, and drainage improvements, with traffic maintained through daily lane/shoulder closures. The solicitation was published December 9, 2025 and closes January 8, 2026 at 2:30 PM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.
Posted Date
Dec 9, 2025
Due Date
Jan 8, 2026
Release: Dec 9, 2025
Close: Jan 8, 2026
Pedestrian and bicycle improvements project. The work involves pavement rehabilitation using a warm mix asphalt overlay, installation of bicycle lanes, sidewalk reconstruction, curb installation, and drainage improvements.
AvailablePremium
Access the largest public sector contact database
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailablePedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
Posted Date
-
Due Date
Jan 15, 2026
Close: Jan 15, 2026
Pedestrian improvements. The principal items of work to be performed under the contract are: site demolition, design and installation of two pedestrian bridges, installation of concrete curb, installation of concrete sidewalks, installation of curb ramps, installation of asphalt pavement, installation of stormwater collection and conveyance facilities, fine grading and topsoil and seeding, and work of similar nature.
AvailableContra Costa County is soliciting a qualified contractor to conduct a 28-month study of enhanced bicycle and pedestrian improvements in the Bay Point area to improve safety and accessibility. The scope includes analysis of existing infrastructure, stakeholder and community engagement, and delivery of recommendations and a comprehensive final report.
Posted Date
Nov 7, 2025
Due Date
Dec 12, 2025
Release: Nov 7, 2025
Close: Dec 12, 2025
Contra Costa County is soliciting a qualified contractor to conduct a 28-month study of enhanced bicycle and pedestrian improvements in the Bay Point area to improve safety and accessibility. The scope includes analysis of existing infrastructure, stakeholder and community engagement, and delivery of recommendations and a comprehensive final report.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis