Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Richland
The Town of Richland seeks engineering services for ADA-compliant sidewalk improvements along Walnut, Lincoln, Division Streets, and Hwy 161, including ramps, lighting, and benches. The project involves approximately 2,200 linear feet of sidewalks and installation of ten streetlights, with federal and local funding. The RFP requires a Letter of Interest and Affirmative Action Certification.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Wakefield
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
Posted Date
Nov 7, 2025
Due Date
Jan 30, 2026
Release: Nov 7, 2025
Town of Wakefield
Close: Jan 30, 2026
Reconstruction of 3,600 LF of ADA-Compliant Sidewalk. Removal and proper disposal of existing sidewalk, curb, and gutter where required. Reconstruction of approx. 3,600 LF of ADA-compliant sidewalk (width per local standards, typically 5 feet minimum). Construction of new curb ramps, detectable warning surfaces, and transitions at driveways and intersections per ADA guidelines. Adjustment of utilities (manholes, valve boxes, etc.) to grade as necessary. Restoration of disturbed areas including landscaping, turf, or pavement. Coordination with local utility providers and municipal departments. Traffic control and flagging per [MUTCD] standards. All permitting and inspections required by local jurisdiction. Compliance with stormwater, erosion, and sediment control requirements.
AvailableCherokee Nation
Work includes 11 LS clearing and grubbing; 91 CY unclassified excavation; 832 CY type a salvaged topsoil; 5,988 SY solid slab sodding; 283 CY aggregate base type a; 9 CY structural excavation unclassified; 40 LF pedestrian guardrail; 40 CY class aa concrete; 2,375 sy 6" concrete sidewalk; 145 SY 6" concrete driveway; 87 LF 18" R.C. Pipe class iii; 46 SY removal of sidewalk.
Posted Date
Oct 24, 2025
Due Date
Dec 1, 2025
Release: Oct 24, 2025
Cherokee Nation
Close: Dec 1, 2025
Work includes 11 LS clearing and grubbing; 91 CY unclassified excavation; 832 CY type a salvaged topsoil; 5,988 SY solid slab sodding; 283 CY aggregate base type a; 9 CY structural excavation unclassified; 40 LF pedestrian guardrail; 40 CY class aa concrete; 2,375 sy 6" concrete sidewalk; 145 SY 6" concrete driveway; 87 LF 18" R.C. Pipe class iii; 46 SY removal of sidewalk.
AvailableCity of Riverside
Project proposes to remove and replace broken concrete curb, gutter, sidewalk and ADA ramps at various locations throughout the city. The project also includes construction of new concrete driveways and sidewalk.
Posted Date
Nov 4, 2025
Due Date
Dec 4, 2025
Release: Nov 4, 2025
City of Riverside
Close: Dec 4, 2025
Project proposes to remove and replace broken concrete curb, gutter, sidewalk and ADA ramps at various locations throughout the city. The project also includes construction of new concrete driveways and sidewalk.
AvailableCherokee Nation
Seeking bids for US 62 Sidewalk and Pedestrian Crossing CN-A944/A983-24-SWPC.
Posted Date
Oct 24, 2025
Due Date
Dec 1, 2025
Release: Oct 24, 2025
Cherokee Nation
Close: Dec 1, 2025
Seeking bids for US 62 Sidewalk and Pedestrian Crossing CN-A944/A983-24-SWPC.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis