Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Tualatin Valley Water District
Project consists of Approx 4,500 LF of eight-inch restrained ductile iron water main, eleven hydrants with associated six-inch piping, new valves and associated appurtenances, with nine new connections to the existing water system (two hot tap and seven in-line connections) with thrust restraints; Reconnection of 89 residential water services between new water lines and existing meters; Roadway paving and striping restoration, and other miscellaneous surface restoration; Abandonment of existing 6" and 4" water lines, valves, hydrants, and associated appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wheat Ridge Water District
The principal work to be provided under this contract shall consist of approx. 2,200 LF of 8" DIP water main replacement. Work shall include all auxiliary items: valves, fire hydrants, excavation, asphalt removal/replacement, landscape removal/replacement, traffic control, and replacement of appurtenances thereto.
Posted Date
Nov 6, 2025
Due Date
Nov 25, 2025
Release: Nov 6, 2025
Wheat Ridge Water District
Close: Nov 25, 2025
The principal work to be provided under this contract shall consist of approx. 2,200 LF of 8" DIP water main replacement. Work shall include all auxiliary items: valves, fire hydrants, excavation, asphalt removal/replacement, landscape removal/replacement, traffic control, and replacement of appurtenances thereto.
AvailableCity of Gahanna
Project consists of water main replacement, concrete sidewalk and curb ramp removal and replacement and other related work; clearing and grubbing; 53 EA of tree removed; 17,273 SY of construction seeding and mulching; 7,562 ft of perimeter filter fabric fence; 88 lf of full depth pavement sawing; 402 cy of asphalt concrete base; 171 CY of asphalt concrete surface course, type 1 (449), pg64-22; 235 SY of 8" non-reinforced concrete pavement, class FS; 6 EA of manhole adjusted to grade (storm); 14,356 sf of 4" concrete sidewalk restoration.
Posted Date
Oct 24, 2025
Due Date
Nov 20, 2025
Release: Oct 24, 2025
City of Gahanna
Close: Nov 20, 2025
Project consists of water main replacement, concrete sidewalk and curb ramp removal and replacement and other related work; clearing and grubbing; 53 EA of tree removed; 17,273 SY of construction seeding and mulching; 7,562 ft of perimeter filter fabric fence; 88 lf of full depth pavement sawing; 402 cy of asphalt concrete base; 171 CY of asphalt concrete surface course, type 1 (449), pg64-22; 235 SY of 8" non-reinforced concrete pavement, class FS; 6 EA of manhole adjusted to grade (storm); 14,356 sf of 4" concrete sidewalk restoration.
AvailableChesterfield County
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
Posted Date
Oct 24, 2025
Due Date
Dec 9, 2025
Release: Oct 24, 2025
Chesterfield County
Close: Dec 9, 2025
The work includes 1,680 LF of 8" water main: 1,460 LF of 6" water main. The work will involve work within the existing pavement, clearing, trenching backfilling and compaction, erosion and sediment control, work within easements and vdot right of way, coordination with property owners, reconnection of existing water services, traffic controls, pavement replacement, and other ancillary items.
AvailableCity of Prescott
Provide park water main replacement for the construction of proposed sidewalks.
Posted Date
Nov 11, 2025
Due Date
Dec 9, 2025
Release: Nov 11, 2025
City of Prescott
Close: Dec 9, 2025
Provide park water main replacement for the construction of proposed sidewalks.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis