Retrieving RFP details
Release
Close
JA Wastewater, LLC
Provide, deliver, and install a wastewater treatment system that is a complete, pre-engineered system for wastewater treatment including testing and assistance with system start-up.
City of Waycross
Wastewater Treatment Facility Upgrades – Phase 2 is described briefly as follows: In general, construction shall consist of conversion of sludge digester #2 to an aerobic digester. Removal of the digester roof, complete clean out, and installation of new mixing and aeration equipment along with slabs, piping, electrical, and controls for a working aerobic digester. Additional plant work shall include a new stairwell, plant by-pass pumping connection, and rehabilitation of the primary clarifier influent lines.
Town of Pelahatchie
Wastewater treatment facility improvements
Fort Bend County Mud 210
Project includes the construction of a 0.30 MGD prefabricated steel basin wastewater treatment plant. Includes all site work, including crushed concrete drive and foundations, asphalt driveway, storm sewer, swales, inlets, concrete pads, fencing, and all electrical controls, wiring, and conduit necessary for a complete system.
Release
Oct 08, 2025
Close
Nov 06, 2025