Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Arlington Local School District
Purchase the current greenhouse.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Warren Correctional Institution
Repairs/renovation of exsisting greenhouse. Both mechanicla systems and glazing. Peplacement of the 8mm polycarbonate roof panels.
Posted Date
Nov 25, 2025
Due Date
Dec 12, 2025
Release: Nov 25, 2025
Warren Correctional Institution
Close: Dec 12, 2025
Repairs/renovation of exsisting greenhouse. Both mechanicla systems and glazing. Peplacement of the 8mm polycarbonate roof panels.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Sierra College
Project consists of concrete slab, footings, assembly, and construction of greenhouse and storage buildings, and related site and electrical work. The greenhouse and storage buildings are owner furnished, both buildings are delivered and have been stored on campus. The greenhouse building includes accessories, including but not limited to, end wall vents, roof vents, exhaust fans, cool air system, heaters, and shade fabric assembly.
Posted Date
Nov 14, 2025
Due Date
Dec 9, 2025
Release: Nov 14, 2025
Sierra College
Close: Dec 9, 2025
Project consists of concrete slab, footings, assembly, and construction of greenhouse and storage buildings, and related site and electrical work. The greenhouse and storage buildings are owner furnished, both buildings are delivered and have been stored on campus. The greenhouse building includes accessories, including but not limited to, end wall vents, roof vents, exhaust fans, cool air system, heaters, and shade fabric assembly.
AvailableSierra College
Project consists of concrete slab, footings, assembly, and construction of greenhouse and storage buildings, and related site and electrical work. The greenhouse and storage buildings are owner furnished, both buildings are delivered and have been stored on campus. The greenhouse building includes accessories, including but not limited to, end wall vents, roof vents, exhaust fans, cool air system, heaters, and shade fabric assembly.
Posted Date
Nov 14, 2025
Due Date
Dec 9, 2025
Release: Nov 14, 2025
Sierra College
Close: Dec 9, 2025
Project consists of concrete slab, footings, assembly, and construction of greenhouse and storage buildings, and related site and electrical work. The greenhouse and storage buildings are owner furnished, both buildings are delivered and have been stored on campus. The greenhouse building includes accessories, including but not limited to, end wall vents, roof vents, exhaust fans, cool air system, heaters, and shade fabric assembly.
AvailableKentucky Community and Technical College System
The project included site preparation and installation of an existing greenhouse. The greenhouse hoop structure and enclosure membrane are to be owner provided and owner installed. The Contractor will need to prep the site for the installation of the structure by BCTC and will need to coordinate closely for the construction of the wood end wall conditions as well as the MEP connections and installation. See outside link.
Posted Date
Nov 25, 2025
Due Date
Dec 11, 2025
Release: Nov 25, 2025
Kentucky Community and Technical College System
Close: Dec 11, 2025
The project included site preparation and installation of an existing greenhouse. The greenhouse hoop structure and enclosure membrane are to be owner provided and owner installed. The Contractor will need to prep the site for the installation of the structure by BCTC and will need to coordinate closely for the construction of the wood end wall conditions as well as the MEP connections and installation. See outside link.