Retrieving RFP details
Release
Close
Orange County Water District
Includes construction of a twelve ion exchange pressure vessels, three pre-treatment cartridge filter vessels, and on-site sodium hypochlorite generation system with chemical storage for the removal of PFAS and disinfection of raw water produced from City wells 18, 32, 36 and 39. The project includes sand separator installation for well 32; well pump and motor upgrades and piping replacements for wells 18, 36 and 39; replacement of the existing hydro- generator; piping improvements; construction of a new well 39 electrical building and well 18 well building; electrical and control improvements; programming; site improvements; and landscaping.
Orange County Water District
Provide PFAS treatment at reservoir.
Suburban Water System
Project consists of installation of 15 MGD PFAS removal, ion exchange (IX) treatment plant.
Orange County Water District
The Orange County Water District solicits proposals for engineering and hydrogeologic services to conduct a feasibility study for a Santa Ana River riverbed filtration system. The contract is expected to start on January 1, 2026, and run until late 2026.
Release
Sep 30, 2025
Close
Nov 13, 2025