Retrieving RFP details
Release
Close
Orange County Water District
The Orange County Water District solicits proposals for engineering and hydrogeologic services to conduct a feasibility study for a Santa Ana River riverbed filtration system. The contract is expected to start on January 1, 2026, and run until late 2026.
Engineering and Hydrogeologic Services Santa Ana River Riverbed Filtration System Feasibility Study RFP
Guttenberg School District
Feasibility study.
Oakland County
Professional engineering firms (Consultant) for the completion of a Feasibility Study for the disinfection alternatives at the George W. Kuhn (GWK) Retention.
Town of Fairfield
Provide an architectural feasibility study of the library's fairfield woods branch. Conduct an existing site analysis and provide recommendations for site upgrades.
Release
Oct 07, 2025
Close
Nov 11, 2025