Coronado Soil And Water Conservation District
Provide construction services for improvements to reservoir. nclude: Flood protection: control of storm water and nuisance flows. Materials testing, quality assurance and submittals allowance. Temporary Pollution Control: NPDES and SWPPP preparation and maintenance. Construction staking. Temporary construction fence. 4' Barbed Wire Fence to be placed along property line, incl. posts & hardware. Site clearing and grubbing. Remove trees, up to 75" circumference, contractor to leave for Las Acequias de Placitas. Remove and dispose existing railroad tie retaining wall. Remove and dispose existing water release valve, gates, outfall pipe and concrete pad. Any combination of cut/fill and/or balance and/or grading, no import or export of material at 95% compaction, Excavate and dispose of unsuitable material. Slope excavation and replacement at 95% compaction for placement of keyed stone wall. Excavation under length of embankment to sandstone base and 2 FT beyond perimeter of embankment per geotechnical report. Misc. Seeding: any disturbed area.
tanquecito_itb
Truckee Meadows Water Authority
The site improvements to 3 water tank sites which will include the following: Regrading the ring road, regrading access road, over excavating unsuitable soil and base, installing new base, installing new pavement, installing new curb and gutter, install new post hydrant, installing storm drain improvements, install new access fence gates, repair fence as necessary.
City of Wilsonville
Work includes of furnishing all materials, labor, equipment, and supervision for 1) the demolition, removal and replacement of the existing fencing and gates at two reservoirs 2) the installation of new conductors for communication equipment to be installed by others and 3) the modification to existing and installation of new fall arrest equipment. See outside link.
Village of Granville
Miscellaneous repairs and improvements at the owner's wastewater treatment plant (WWTP). The project will include the following: given a 30-day notice, the village will drain and hose clean the tankage in its entirety. Once the tank is drained, the contractor shall re-coat portions of the interior walls and hardware of the tanks. The aeration system will be reconfigured, and new diffusers will be installed with new air piping around the circumference of the tanks. The owner will provide de-watering to prevent flotation, then drain and hose clean the tankage. All in-coming wastewater will be diverted by the owner into the adjacent lagoon. The owner will provide the de-watering and wastewater diversion for the duration of the project with the tank drained, the contractor shall re-coat portions of the interior walls of the tanks. The aeration system will be reconfigured, and new diffusers will be installed with new air piping around the circumference of the tanks. Miscellaneous repairs will also be performed.
Release
Oct 12, 2025
Close
Nov 20, 2025