Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Village of Winnetka
The Village of Winnetka is soliciting bids for a substation transformer per the specifications in the bid documents. Bids are due December 10, 2025 at 11:00 AM Central.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Cozad
Furnishing and setting in place one 7.5 MVA substation transformer. See outside link.
Posted Date
Oct 28, 2025
Due Date
Dec 18, 2025
Release: Oct 28, 2025
City of Cozad
Close: Dec 18, 2025
Furnishing and setting in place one 7.5 MVA substation transformer. See outside link.
AvailableCity of Ukiah
Project consists of draining and storing the transformer oil and inspecting the interior of transformer tr-2. See outside link.
Posted Date
Nov 13, 2025
Due Date
Dec 16, 2025
Release: Nov 13, 2025
City of Ukiah
Close: Dec 16, 2025
Project consists of draining and storing the transformer oil and inspecting the interior of transformer tr-2. See outside link.
AvailableCity of Geneva
Project will consist of: a maintenance cycle on the power transformer and load tap changer at substation. All relay settings and schemes will be tested and verified along with proper operation and timing of the associated circuit breakers. The standby substation service battery.
Posted Date
Nov 20, 2025
Due Date
Dec 22, 2025
Release: Nov 20, 2025
City of Geneva
Close: Dec 22, 2025
Project will consist of: a maintenance cycle on the power transformer and load tap changer at substation. All relay settings and schemes will be tested and verified along with proper operation and timing of the associated circuit breakers. The standby substation service battery.
AvailableCity of Stockton
Work consists of remove and disconnect an existing 60kv transformer and store on the city's boneyard property; install new city furnished 60kv transformer on existing concrete pad; coordination with manufacturer to install all bushing and fluids; connect primary, secondary, and control wiring; provide substation grounding; provide rental generator(s) to continuously supply 5,000 kw of power throughout the duration of the project and ensure no power interruption.
Posted Date
Aug 21, 2025
Due Date
Dec 4, 2025
Release: Aug 21, 2025
City of Stockton
Close: Dec 4, 2025
Work consists of remove and disconnect an existing 60kv transformer and store on the city's boneyard property; install new city furnished 60kv transformer on existing concrete pad; coordination with manufacturer to install all bushing and fluids; connect primary, secondary, and control wiring; provide substation grounding; provide rental generator(s) to continuously supply 5,000 kw of power throughout the duration of the project and ensure no power interruption.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis