Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Jefferson Parish
Project consists of new street lighting mounted on drilled shaft concrete foundations and all required electrical service and controls.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Deltona
Work includes the elevation of the roadway profile a minimum of 3 feet above the fema published base flood (100-year) elevation (27 ft, navd).
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Deltona
Close: Nov 25, 2025
Work includes the elevation of the roadway profile a minimum of 3 feet above the fema published base flood (100-year) elevation (27 ft, navd).
AvailableCity of St. George
The City of St. George, Utah requests bids for the George Washington Blvd Bridge construction project. Bids require a 5% bid bond and a 100% performance (labor and materials) bond, with detailed plans and specifications provided in the Bonfire portal.
Posted Date
Nov 6, 2025
Due Date
Dec 4, 2025
Release: Nov 6, 2025
City of St. George
Close: Dec 4, 2025
The City of St. George, Utah requests bids for the George Washington Blvd Bridge construction project. Bids require a 5% bid bond and a 100% performance (labor and materials) bond, with detailed plans and specifications provided in the Bonfire portal.
AvailableCity of Pompano Beach
The work will include, but not be limited to, swales, pump station, site preparation, earthwork, dewatering, new outfall, drainage installation and improvements, roadway and driveway restoration, tree removal, landscape restoration, restoring existing irrigation systems, and pavement marking and signage.
Posted Date
Oct 29, 2025
Due Date
Dec 3, 2025
Release: Oct 29, 2025
City of Pompano Beach
Close: Dec 3, 2025
The work will include, but not be limited to, swales, pump station, site preparation, earthwork, dewatering, new outfall, drainage installation and improvements, roadway and driveway restoration, tree removal, landscape restoration, restoring existing irrigation systems, and pavement marking and signage.
AvailableGlynn County
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
Posted Date
Nov 5, 2025
Due Date
Dec 5, 2025
Release: Nov 5, 2025
Glynn County
Close: Dec 5, 2025
Replacement of the existing storm drainage system. Identified in the attached plans. The work to be performed under this contract consists of furnishing all labor, equipment, materials/products and performing all project coordination necessary to replace the existing stormwater drainage system. The stormwater drainage improvement construction includes but is not limited to the removal and replacement of asphalt pavement, curb and gutter asphalt milling and removal and disposal of the existing storm system within the project limits as identified within the plans and includes installation of new concrete storm pipe structures and junctions as identified in the plans, Grassing and erosion control measures all work shall be in accordance with the technical specifications, special provisions and the construction drawings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis