Retrieving RFP details
Release
Close
City of Bakersfield
Work shall include roadway excavation of the existing pavement, grinding existing concrete pavement, installation of new hot mix asphalt (HMA), installation of new HMA over a geosynthetic pavement interlayer. Other items include clearing and grubbing, removal of existing concrete items such as curb & gutter, sidewalk, construction of new concrete curb & gutter, sidewalk, access ramps, decorative concrete, decorative pavers, storm drainage improvements, bioswales, street lighting improvements, street site furnishing, landscaping and irrigation improvements, pavement markings, pavement striping, bicycle facilities, bicycle markings and striping, adjustment of manholes and monuments and various appurtenances to construct the project
City of Bentonville
Work consists of Stormwater improvements that will divert the drainage from a culvert under SW 2nd street to a proposed storm sewer system which will run parallel to SW 2nd (HWY72). The work is expected to include but not be limited to excavation, sodding, erosion control, tree protection, temporary traffic control, and mobilization required.
City of Pocola
Street improvements. Work includes roll shoulders; pulverize existing pavement to existing base and haul offsite; 6" aggretate base (SB-2), water and compact existing base; tack coat; compacted virgin asphalt - final thickness 3".
Release
Sep 25, 2025
Close
Nov 06, 2025