Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Virginia Department of Transportation
Work includes: 192 SF of temporary sign; group 2 channelizing devices; 296 HR of electronic arrow board; police patrol uniformed flaggers; topsoil class a 2"; 10 LB of permanent seed; rolled erosion ctrl product ec-2 type 4; 14 LF of sign post stp-1, 2 3/16", 10 gauge; sign post stp-1, 2 1/2", 10 gauge; electrical service se-5; 500 LF of bored conduit 2"; 120 LF of conduit PVC 3". See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Virginia Department of Transportation
Work consists of 580 SF, temporary sign; 100 LF, pedestrian barricade device; 1,512 DAY, warning light TY. A; 350 LF, 2 conductor cable; 21,250 LF, 8 conductor cable; 5,300 LF, 8 conductor cable EGC; 6 EA, electrical service work pad; 4,150 LF, bored conduit 3"; 810 LF, trench excavation ECI-1. See attached file and outside link.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work consists of 580 SF, temporary sign; 100 LF, pedestrian barricade device; 1,512 DAY, warning light TY. A; 350 LF, 2 conductor cable; 21,250 LF, 8 conductor cable; 5,300 LF, 8 conductor cable EGC; 6 EA, electrical service work pad; 4,150 LF, bored conduit 3"; 810 LF, trench excavation ECI-1. See attached file and outside link.
AvailableVirginia Department of Transportation
Work include 8 LF 15" pipe; 164 LF 18" conc. Pipe; 177 CY regular excavation; 137 CY siltation control excavation; 783 LF temp. Silt fence type a; 412 CY borrow excavation; 633 saw-cut asphalt concrete asphalt; 64 LF crossdrain cd-2; 122 SY paved ditch pg-2a; 444 LF curb, std. Cg-3; 256 SY demo. Of pavement flexible; 610 SF temporary sign; 374 LF temp. Pvmt mrkg ty. A, 4"; 1067 SY flexible pave. Planing 0"- 2"; 96 LF sign post stp-1, 2", 14 gauge; 1,150 LF type b class i pvmt line mrkg 6"; 40 LF type b class ii pvmt line mrkg 24".
Posted Date
-
Due Date
Nov 19, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work include 8 LF 15" pipe; 164 LF 18" conc. Pipe; 177 CY regular excavation; 137 CY siltation control excavation; 783 LF temp. Silt fence type a; 412 CY borrow excavation; 633 saw-cut asphalt concrete asphalt; 64 LF crossdrain cd-2; 122 SY paved ditch pg-2a; 444 LF curb, std. Cg-3; 256 SY demo. Of pavement flexible; 610 SF temporary sign; 374 LF temp. Pvmt mrkg ty. A, 4"; 1067 SY flexible pave. Planing 0"- 2"; 96 LF sign post stp-1, 2", 14 gauge; 1,150 LF type b class i pvmt line mrkg 6"; 40 LF type b class ii pvmt line mrkg 24".
AvailableVirginia Department of Transportation
Work includes: 2 EA of endwall ew-12; grading, 660 CY of borrow excavation min. Cbr-5; 3 EA of check dam rock ty. II; 1 EA of dewatering basin ec-8 EA; 206 CY of siltation control excavation; 1,210 LF of temp. Silt fence type A; asphalt concrete ty. Sm12.5d const; asphalt concrete bm-25.0; 1,505. 000 LF of saw-cut asph conc full depth; 40 LF of outlet pipe; guardrail gr-mgs1; 860 LF of remove existing guardrail. See attached file.
Posted Date
Oct 14, 2025
Due Date
Nov 19, 2025
Release: Oct 14, 2025
Virginia Department of Transportation
Close: Nov 19, 2025
Work includes: 2 EA of endwall ew-12; grading, 660 CY of borrow excavation min. Cbr-5; 3 EA of check dam rock ty. II; 1 EA of dewatering basin ec-8 EA; 206 CY of siltation control excavation; 1,210 LF of temp. Silt fence type A; asphalt concrete ty. Sm12.5d const; asphalt concrete bm-25.0; 1,505. 000 LF of saw-cut asph conc full depth; 40 LF of outlet pipe; guardrail gr-mgs1; 860 LF of remove existing guardrail. See attached file.
AvailableVirginia Department of Transportation
Work includes 1 LS of clearing and grubbing; 35.200 CY of concrete class A4 box culvert; 3,679 LB of corrosion resistant reinforce steel class I; 48 LF of 15" storm sewer pipe; see attached file.
Posted Date
Nov 12, 2025
Due Date
Dec 17, 2025
Release: Nov 12, 2025
Virginia Department of Transportation
Close: Dec 17, 2025
Work includes 1 LS of clearing and grubbing; 35.200 CY of concrete class A4 box culvert; 3,679 LB of corrosion resistant reinforce steel class I; 48 LF of 15" storm sewer pipe; see attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis