City of Inglewood
City hall roof storm drain system upgrades for the 3rd, 2nd and 1st floors.
City of Murray
Work includes installation of approximately 2,500' of 42" rcp storm drainpipe and 850 feet of 36" rcp storm drainpipe, storm drain trunkline will generally be placed 13 feet deep under the roadway and require dewatering of groundwater, groundwater generally starts 6 feet under the road surface and 7 feet over top of the trench bottom. Additionally, 64 feet of 36-inch pipe and 45 feet of 15-inch storm drainpipe will be placed in 5600 south, installation of manholes and inlet boxes.
City of Portland
Provide a resident inspector for the purposes of providing construction observation, oversight, documentation and associated professional services for the city s commercial street and portland fish pier storm drain outfall project.
City of Highland
Seeking services for storm drain sump maintenance.
Release
Oct 20, 2025
Close
Nov 12, 2025