Retrieving RFP details
Release
Close
City of Murray
Work includes installation of approximately 2,500' of 42" rcp storm drainpipe and 850 feet of 36" rcp storm drainpipe, storm drain trunkline will generally be placed 13 feet deep under the roadway and require dewatering of groundwater, groundwater generally starts 6 feet under the road surface and 7 feet over top of the trench bottom. Additionally, 64 feet of 36-inch pipe and 45 feet of 15-inch storm drainpipe will be placed in 5600 south, installation of manholes and inlet boxes.
Prequalification 900 East Storm Drain
City of Inglewood
City hall roof storm drain system upgrades for the 3rd, 2nd and 1st floors.
City of Salt Lake City
Work includes installation of approx 900 LF of 36" storm drain and 850 LF of 24" storm drain along with associated catch basins and tie ins to existing storm infrastructure. 1,800 LF of 24" and 36" rcp storm drain pipe.
City of Portland
Provide a resident inspector for the purposes of providing construction observation, oversight, documentation and associated professional services for the city s commercial street and portland fish pier storm drain outfall project.
Release
Oct 19, 2025
Close
Nov 03, 2025