Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Pennsylvania Department of Conservation and Natural Resources
The Pennsylvania DCNR is soliciting bids to replace four structures in Sproul State Forest (Bridges 10-0062, 10-0085, 10-0087, and 10-0060) in Leidy Township, Clinton County. Work includes replacement with precast concrete structures, rock lining, approach roadway DSA, architectural surface treatments, and guide rail.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Pennsylvania Department of Conservation and Natural Resources
Project will replace an existing concrete slab bridge structure on pfoutz valley road. The replacement structure is a precast reinforced concrete rigid frame. This project will also replace a corrugated metal structure carrying stony run road over unnamed tributary (unt) to stony run. Replacement structure is a precast concrete box culvert. Other work includes rock lining, architectural surface, dsa approach roadway, and guide rail.
Posted Date
Nov 19, 2025
Due Date
Dec 18, 2025
Release: Nov 19, 2025
Pennsylvania Department of Conservation and Natural Resources
Close: Dec 18, 2025
Project will replace an existing concrete slab bridge structure on pfoutz valley road. The replacement structure is a precast reinforced concrete rigid frame. This project will also replace a corrugated metal structure carrying stony run road over unnamed tributary (unt) to stony run. Replacement structure is a precast concrete box culvert. Other work includes rock lining, architectural surface, dsa approach roadway, and guide rail.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Merrick County
Project includes traffic control, removal of existing bridge, earthwork, construction of twin 14 ft x 5 ft x 46 ft long reinforced concrete box culvert, construction of twin 14 ft x 5 ft x 52 ft long reinforced concrete box culvert and concrete pavement, construction of quad 12 ft x 8 ft x 54 ft long reinforced concrete box culvert and concrete pavement, and associated work.
Posted Date
Nov 20, 2025
Due Date
Dec 9, 2025
Release: Nov 20, 2025
Merrick County
Close: Dec 9, 2025
Project includes traffic control, removal of existing bridge, earthwork, construction of twin 14 ft x 5 ft x 46 ft long reinforced concrete box culvert, construction of twin 14 ft x 5 ft x 52 ft long reinforced concrete box culvert and concrete pavement, construction of quad 12 ft x 8 ft x 54 ft long reinforced concrete box culvert and concrete pavement, and associated work.
AvailableMinnesota Department of Administration
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
Posted Date
Aug 21, 2025
Due Date
Sep 10, 2026
Release: Aug 21, 2025
Minnesota Department of Administration
Close: Sep 10, 2026
State Project No. 2026-089-8F129 This Project is Targeted Group (TG) Economically Disadvantaged (ED) Veteran-Owned preference. A.The work will be completed under one prime contract. B.The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract; Excavation and demolition of existing culvert structures; Stream restoration work involving natural materials and vegetation establishment; Fabricate, furnish, and install Aluminum Box Culvert Structure.; Erosion control, sediment control, and permanent vegetation establishment; Traffic control and permanent signage. See outside link.
AvailableTown of Deerpark
Demolition of the structure.
Posted Date
Nov 23, 2025
Due Date
Dec 17, 2025
Release: Nov 23, 2025
Town of Deerpark
Close: Dec 17, 2025
Demolition of the structure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.