Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Concord
Project includes the removal of the existing culvert structure and construction of a new box culvert structure with associated wingwalls, headwalls, roadway reconstruction, and guardrail systems.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Town of Shrewsbury
Replacement of existing 6 FT culvert with a new precast box culvert and wingwalls along the Cold Brook on Northam Road in Town of Shrewsbury, Vermont. Specifically, the work will include mobilization, traffic control, sediment and erosion control, excavation, control of water, removal of the existing culvert, installation of new precast culvert & wingwalls, full depth roadway reconstruction, asphalt paving, pavement markings, guardrail, restoration and related roadway and channel work in accordance with the contract plans and specifications.
Posted Date
Oct 17, 2025
Due Date
Nov 18, 2025
Release: Oct 17, 2025
Town of Shrewsbury
Close: Nov 18, 2025
Replacement of existing 6 FT culvert with a new precast box culvert and wingwalls along the Cold Brook on Northam Road in Town of Shrewsbury, Vermont. Specifically, the work will include mobilization, traffic control, sediment and erosion control, excavation, control of water, removal of the existing culvert, installation of new precast culvert & wingwalls, full depth roadway reconstruction, asphalt paving, pavement markings, guardrail, restoration and related roadway and channel work in accordance with the contract plans and specifications.
Tom Green County
Provide culvert replacement, road repair, and associated items. Includes fence removal and replacement; remove existing fence within project limits. Replace fence post-construction in original or better condition. Provide temporary fencing. Reconstruct the water gap (flood-prone opening) on the downstream side to match pre-project condition and function. See attached files.
Posted Date
Oct 28, 2025
Due Date
Dec 16, 2025
Release: Oct 28, 2025
Tom Green County
Close: Dec 16, 2025
Provide culvert replacement, road repair, and associated items. Includes fence removal and replacement; remove existing fence within project limits. Replace fence post-construction in original or better condition. Provide temporary fencing. Reconstruct the water gap (flood-prone opening) on the downstream side to match pre-project condition and function. See attached files.
AvailableMultnomah County
Construct new 12-foot diameter culvert under roadway, replacing two failed culverts previously backfilled and paved over includes 144 SY matting type D, 630 foot sediment fence, 555 ton contaminated soil disposal, 2,850 CY general excavation, 193 LF 144" culvert pipe.
Posted Date
Nov 10, 2025
Due Date
Dec 9, 2025
Release: Nov 10, 2025
Multnomah County
Close: Dec 9, 2025
Construct new 12-foot diameter culvert under roadway, replacing two failed culverts previously backfilled and paved over includes 144 SY matting type D, 630 foot sediment fence, 555 ton contaminated soil disposal, 2,850 CY general excavation, 193 LF 144" culvert pipe.
AvailableTown of Salina
Remove the existing structure and replacement with a precast box culvert and wingwalls, 180 feet of full-depth asphalt pavement reconstruction, and 83 feet of sewer main relocation.
Posted Date
Nov 14, 2025
Due Date
Dec 16, 2025
Release: Nov 14, 2025
Town of Salina
Close: Dec 16, 2025
Remove the existing structure and replacement with a precast box culvert and wingwalls, 180 feet of full-depth asphalt pavement reconstruction, and 83 feet of sewer main relocation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis