Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes approx 3,837 CY common embankment; 4950 ton random riprap class iv; 540 LF install 3-cable guardrail; 650 LF flotation silt curtain type moving water. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Posted Date
Nov 18, 2025
Due Date
Jan 20, 2026
Release: Nov 18, 2025
Close: Jan 20, 2026
The project includes stream stabilization along the river to include but not limited to: grading, excavation, and select structure placement to stabilize the eroding stream bank. Structures to be utilized include rock cross vanes, constructed stone riffles, and live stakes. Stream banks and riparian will be planted with native trees, shrubs, and grasses.
Premium
Access the largest public sector contact database
Release: Nov 28, 2025
Close: Dec 17, 2025
Streambank stabilization.
AvailableCottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Cottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
AvailableCottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Cottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.