Retrieving RFP details
Release
Close
City of Tualatin
Construct a 2.5 mg prestressed concrete water reservoir and a concrete masonry unit pump station with standby power, site utilities and grading, paving and access improvements, electrical, controls, SCADA integration, and related demolition, restoration, and landscaping.
reservoir
zip
City of Aubrey
Construction of the 0.72-mgd rockhill pump station, and the 0.40-mg awwa d100 welded steel ground storage reservoir, 2,592 SY of 8" thick reinforced concrete pavement, 1,318 LF of 12" waterline, along with necessary appurtenances to make the pump station and ground storage reservoir functional and operational.
Surgoinsville Utility District
Construction of pump station.
Cedar River Water And Sewer District
Replace existing diesel pump fire pump system with electrical vertical in-line booster pump (pump No. 3). Replace pump No. 1 and pump No. 2. Provide temp bypass pumping with backup power. Provide new mechanical piping, valves, flow meter, and water quality analyzer. Install an outdoor-rated 250 kW generator with sub-base diesel fuel tank. Upsize utility pole-mount transformers, secondary conductors, and conduit. Replace 200-amp rated electrical service and distribution equipment with 400-amp rated equipment. Install a VFD for new pump No. 3. Replace step-down transformer inside the building, pump No. 1 and pump No. 2 VFDs, and building overhead lights, outdoor lights, and site light.
Release
Oct 21, 2025
Close
Nov 20, 2025