Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct 6" and 8" PVC and 16" DI potable waterlines including fire hydrants, boring, cold plane pavement removal, and asphalt concrete paving.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
Posted Date
Nov 16, 2025
Due Date
Dec 16, 2025
Release: Nov 16, 2025
Close: Dec 16, 2025
Work items is included below: approximately 800 lf of 16-inch diameter D.I Water main; approximately 2,400 lf of 12-inch diameter D.I Water main; approximately 860 lf of 8-inch, 6-inch and 4-inch diameter D.I Water main; associated water service installations and transfers; associated water main appurtenances and fittings; associated asphalt paving replacement.
Premium
Access the largest public sector contact database
Work includes south main commons renovation.
Posted Date
Nov 9, 2025
Due Date
Dec 19, 2025
Release: Nov 9, 2025
Close: Dec 19, 2025
Work includes south main commons renovation.
AvailableProvide water main parts.
Posted Date
Dec 10, 2025
Due Date
Dec 29, 2025
Release: Dec 10, 2025
Close: Dec 29, 2025
Provide water main parts.
AvailableWater main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
Posted Date
Nov 19, 2025
Due Date
Dec 15, 2025
Release: Nov 19, 2025
Close: Dec 15, 2025
Water main replacement. Including 1 LS Abandon existing 6-inch water main, cut pipe, cap pipe; 481 LF 6" Ductile Iron Concrete Lined (DICL) Water Main; 98 ton AASHTO #8 Stone; 165 ton 2A Subbase; 13 ton 2" Cold Patch to match existing elevation; 12 SY sidewalk restoration - match existing reveal; 22 LF curb restoration - match existing reveal; 2 ea connect new 6" water main to existing 6" pipe; 2 ea connect new 6" water main to existing 10" pipe 1 ea fire hydrant with 6" DIP, 6" gate valve and 3"X6" tee. See attached file.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis