Retrieving RFP details
Release
Close
Cowlitz County
Raise the existing earthen detention structure approx. 15' and construct approx. 200' long by 75' wide reinforced concrete spillway, a 12' x 10' by 40' tall reinforced concrete slide gate structure, reinforced concrete low flow inlet structure, reinforced concrete flow control outlet structures, 305 LF 48" DI pipe, approx. 1,500 LF gravel access road, 125 LF 12" HDPE pipe, plug and abandon 160 LF existing 36" storm pipe, chimney drains, staff gauge, erosion and water pollution control, and site restoration.
Creek
zip
Chugach Electric Association, Inc.
Civil site work beluga structure repair phase 2 - revetment protection w. O. E2420082.
City of Crystal Lake
Phase 1: Installation/relocation of all impacted underground utilities (storm sewer, sanitary sewer, water main), installation of the far upstream and downstream reinforced concrete box culverts (RCBC) and headwalls, Soil Erosion/Sediment Control measures, and all necessary restoration. Phase 2: Installation of the remaining proposed reinforced concrete box culverts (RCBC) and headwalls, proposed creek grading and appurtenances for stabilization, Soil Erosion/Sediment Control measures, and all necessary restoration.
Council Rock School District
Provide construction management services associated with Phase 2 of the High School South Stadium Renovations. Each project shall include the following services: Design Phase 1 - Programming and Schematic Design. Design Phase 2 - Design Development. Design Phase 3 - Construction Documents. Design Phase 4 - Bidding. Construction. Post-Construction Phase.
Release
Oct 08, 2025
Close
Nov 18, 2025