Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sioux Falls
Roof Drain Repair.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Sioux Falls
Project is a replacement and addition of hydraulic dock levelers at the convention center, dock seals replacement.
Posted Date
Nov 28, 2025
Due Date
Dec 18, 2025
Release: Nov 28, 2025
City of Sioux Falls
Close: Dec 18, 2025
Project is a replacement and addition of hydraulic dock levelers at the convention center, dock seals replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Greater Hartford Transit District
Repair the existing roof drain line system. The primary scope of work will consist of replacing and rerouting the existing storm drain lines with new drain lines and the addition of secondary drains. At the roof level, new secondary (emergency) overflow drains will be installed. At the attic level, existing vertical drain lines will be cut and capped, and new drain lines will run into the lower floors, enclosed in a new chase. At the first-floor level, there will be limited demolition of the masonry and brownstone to install two emergency overflow outlets, one at each of the vestibules to the side of the great hall. The primary drains will continue below grade, one vertical line at each of the vestibules, and will connect at a new manhole below the sidewalk. Downstream of the new storm manhole, the existing drain line that connects to the gully brook storm sewer will be removed and replaced with a new pipe. All drainage work outside of the building will involve demolition of the concrete sidewalk panels and pavers and roadway asphalt to install new pipe. The hardscaping of the site will be restored to the existing conditions.
Posted Date
Oct 10, 2025
Due Date
Dec 5, 2025
Release: Oct 10, 2025
Greater Hartford Transit District
Close: Dec 5, 2025
Repair the existing roof drain line system. The primary scope of work will consist of replacing and rerouting the existing storm drain lines with new drain lines and the addition of secondary drains. At the roof level, new secondary (emergency) overflow drains will be installed. At the attic level, existing vertical drain lines will be cut and capped, and new drain lines will run into the lower floors, enclosed in a new chase. At the first-floor level, there will be limited demolition of the masonry and brownstone to install two emergency overflow outlets, one at each of the vestibules to the side of the great hall. The primary drains will continue below grade, one vertical line at each of the vestibules, and will connect at a new manhole below the sidewalk. Downstream of the new storm manhole, the existing drain line that connects to the gully brook storm sewer will be removed and replaced with a new pipe. All drainage work outside of the building will involve demolition of the concrete sidewalk panels and pavers and roadway asphalt to install new pipe. The hardscaping of the site will be restored to the existing conditions.
AvailableSioux Falls Regional Airport Authority
The Sioux Falls Regional Airport Authority is soliciting sealed bids for a replacement ARFF Truck (Index B, Class 4) and associated communications and auxiliary equipment. Bids are due December 4, 2025 at 3:00 PM CT, with documents available via KLJ/QuestCDN (Project #9949131).
Posted Date
Nov 12, 2025
Due Date
Dec 4, 2025
Release: Nov 12, 2025
Sioux Falls Regional Airport Authority
Close: Dec 4, 2025
The Sioux Falls Regional Airport Authority is soliciting sealed bids for a replacement ARFF Truck (Index B, Class 4) and associated communications and auxiliary equipment. Bids are due December 4, 2025 at 3:00 PM CT, with documents available via KLJ/QuestCDN (Project #9949131).
Lehigh County
To repair the valley preferred cycling center press box roof.
Posted Date
Nov 6, 2025
Due Date
Dec 10, 2025
Release: Nov 6, 2025
Lehigh County
Close: Dec 10, 2025
To repair the valley preferred cycling center press box roof.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →