Retrieving RFP details
Release
Close
City of Sumter
Work include ew duplex submersible sewer pump station with new wetwell, generator, electrical equipment, access drive and all associated appurtenances, 560 LF of 15" gravity sewer, 13,00 LF of 16" sewer force main, and 18 air release valves.
Township of South Hanover
Construction of a new pump station with a wet well and control building a new force main from the new pump station to an existing manhole lining of connecting manholes and site work.
City of Johnson City
Construction of a new gravity interceptor, pump station, and force main in Washington County, Tennessee. The project generally includes a new 18" gravity interceptor, package wastewater pump station, solids grinder, 12" force main, surge valve, Yard piping and valving, electrical, standby generator, site work, and paving. An existing pump station will also be demolished after the new station is operational.
King County
rehabilitate the east force main of the Murray Pump Station, approx. 350 LF of 27" bar-wrapped concrete cylinder pipe (CCP) and install two vacuum relief valve assemblies. The work includes but is not limited to installation of a below grade precast concrete structure to house the relief valve assembly, installation of a 2nd assembly within the Murray Pump Station equipment room, sewer diversion to the west force main during rehabilitation, and restoration of concrete panels along Beach Dr SW, and all other work required in the Contract documents.
Release
Oct 14, 2025
Close
Nov 19, 2025