Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Allegheny County
To remove approx 82,600 SF of existing modified bitumen roofing systems, including associated materials and edge metal, down to the deck at flat roof areas as indicated. Remove existing roof penetrations and provide deck infill as required. Demolish the existing sloped skylight and provide new deck infill and structural supports. Install new tapered insulation and roofing assemblies at flat roof areas, and new flat insulation and roofing assemblies at approx 6,000 SF of steep-slope roof areas, as indicated. Provide a fully adhered EPDM roofing system with a 30-year warranty, including new edge metal systems at both flat and steep-slope roof areas. Demolish existing roof deck and install supplemental structural steel where indicated per the structural details. Provide cold-formed metal framing at skylight curbs and install new skylight assemblies. Design, furnish, and install a complete solar photovoltaic (PV) system, including all electrical components and racking, in the areas indicated on the contract documents. Provide new electrical utility service to tie the PV system into the utility grid. Coordination with Duquesne Light Company is required.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Allegheny County
This IFB solicits contractors to remove and replace roofing at the Shuman Juvenile Detention Center, including removal of approximately 82,600 square feet of existing modified bitumen roofing, replacement insulation, and installation of a fully adhered EPDM roofing system with a 30-year warranty, plus structural and skylight repairs. The project also includes design and installation of a solar photovoltaic (PV) system with new electrical utility service (coordination with Duquesne Light Company required), and the solicitation is organized into prime contracts for General Construction and Electrical Construction.
Posted Date
-
Due Date
Jan 7, 2026
Allegheny County
Close: Jan 7, 2026
This IFB solicits contractors to remove and replace roofing at the Shuman Juvenile Detention Center, including removal of approximately 82,600 square feet of existing modified bitumen roofing, replacement insulation, and installation of a fully adhered EPDM roofing system with a 30-year warranty, plus structural and skylight repairs. The project also includes design and installation of a solar photovoltaic (PV) system with new electrical utility service (coordination with Duquesne Light Company required), and the solicitation is organized into prime contracts for General Construction and Electrical Construction.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Charleston
Work includes county detention center energy plant and admin roof replacement.
Posted Date
Oct 30, 2025
Due Date
Dec 16, 2025
Release: Oct 30, 2025
City of Charleston
Close: Dec 16, 2025
Work includes county detention center energy plant and admin roof replacement.
AvailableHennepin County
The project modernizes and upgrades three elevators at the Hennepin County Juvenile Detention Center in Minneapolis to meet current ASME Elevator 2016, IBC, and ADA requirements and to integrate with facility security and improve energy efficiency. Printed sets of plans and a plan holders list are available from ARC Document Solutions; the aggregator notes documents are not tracked on the listing itself.
Posted Date
-
Due Date
Jan 7, 2026
Hennepin County
Close: Jan 7, 2026
The project modernizes and upgrades three elevators at the Hennepin County Juvenile Detention Center in Minneapolis to meet current ASME Elevator 2016, IBC, and ADA requirements and to integrate with facility security and improve energy efficiency. Printed sets of plans and a plan holders list are available from ARC Document Solutions; the aggregator notes documents are not tracked on the listing itself.
AvailablePrince William County
Roof replacement.
Posted Date
Nov 6, 2025
Due Date
Dec 16, 2025
Release: Nov 6, 2025
Prince William County
Close: Dec 16, 2025
Roof replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo β