Retrieving RFP details
Release
Close
Town of Trappe
Work consists of 1,214' of 8" fiberglass liner, reinstate laterals after lining, jetting sewer lines prior to installation of liner, bypass pumping during installation of the 8" liners, completing a cctv inspection of the installed liners at completion, removing and replacing necessary asphalt.
City of Milwaukee
Work consists of sanitary sewer main relay and sanitary sewer main lining.
City of Milwaukee
Work consists of Combined Sewer Main Lining.
Montecito Sanitary District
Work includes approx. 5,227 LF of pre-rehabilitation sewer main cleaning-flushing (remaining pipelines); 5,227 LF of pre-rehabilitation sewer main CCTV inspection (Remaining Pipelines); 5,227 LF of post-rehabilitation CCTV inspection (remaining pipelines); 1,129 LF of pre-rehabilitation sewer main cleaning-flushing (MH M9M51 to M9M48); 1,129 LF of pre-rehabilitation sewer main CCTV inspection (MH M9M51 to M9M48); 1,129 LF of post-rehabilitation CCTV inspection (MH M9M51 to M9M48); 1,129 LF of rehabilitate 21" sanitary sewer pipe (MH M9M51 to M9M48); 4,890 LF of rehabilitate 21" sanitary sewer pipe (Remaining Pipelines); 337 LF of Rehabilitate 8" sanitary sewer pipe; 291 VF of rehabilitate and line existing 48" manhole (remaining manholes); 57 VF of rehabilitate and line existing 48" manhole (M9M48 through M9M51); see outside link for more details.
Release
Oct 08, 2025
Close
Nov 03, 2025