Work includes remove and replace a duplex sewer lift station with control panel; ensure new lift station pumps will meet the demands of the system; remove and dispose of existing pumps and any associated plumbing equipment; remove and replace, or repair existing electrical control panel; installation of new pumps; test new pumps for proper function.
sewer_lift_station_duplex_pump_replacement_for_coyote_point_recreation_area-2025-10-22-09-56-56
zip
City of Kenner
The upgrades include construction of a new submersible duplex sewer lift station with a new wet well, submersible pumps, discharge piping, valve pit, valves, emergency pump out, new control.
City of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
City of Huntington Beach
The work consists of replacement and modernization of the sewer lift station. The work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, ac paving, and other appurtenant work.