Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Dakota Office of Procurement Management
Software solution to integrate with the existing South Dakota security camera solution, Milestone, to provide evidentiary storage and sharing that adheres to all relevant policies and regulations, including but not limited to, HIPAA and/or FEDRAMP. The contract resulting from this RFP will be issued for the period beginning approx. March 1, 2026, to May 31, 2027, with the option for renewal for (4), one (1) year contracts.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
JBWS Safety, Support & Solutions For Abuse
Furnish and install exterior security camera systems for two of our buildings. The purpose of this RFP is to enhance perimeter security, deter unauthorized access, and enable high-quality video monitoring and recording for safety and liability purposes. 2. Project Overview The selected vendor will be responsible for: Conducting a site assessment of both buildings. Current system has 22 cameras for one building, and 12 for the other. Each building has a dedicated DVR.Recommending appropriate camera models, quantities, and placement (hard-wired or wifi based on recommendation). Providing and installing all necessary hardware and software.Ensuring system integration with existing or new Network Video Recorder (NVR) or cloud infrastructure.Training staff on system usage and maintenance.Offering warranty and possibly ongoing technical support. 3. Scope of Work 3.1 Site Assessment On-site inspection of exterior perimeters.Identification of high-risk areas (entry/exit points, parking lots, blind spots, etc.). 3.2 Camera Specifications Weatherproof (IP66 or higher) and vandal-resistant housing.High-definition resolution (1080p minimum). Infrared night vision (at least 100ft range).Wide dynamic range (WDR) for varied lighting conditions. Motion detection and smart alerts (preferred). Power over Ethernet (PoE) or wireless options with backup power (wired preferred). 3.3 Installation Mounting of cameras at recommended locations.Running cables, power, and networking connections as needed.Ensuring proper system configuration for monitoring and recording. 3.4 Recording and Monitoring Minimum 30-day video storage capacity.Motion activation settings for certain or all cameras.Remote access capabilities (mobile, desktop).User-friendly interface for live view, playback, and export of footage. 3.5 Training and Documentation Basic training for designated personnel.Documentation including camera map, user guides, warranty information, and support contacts. 3.6 Warranty and Support Required warranty on hardware and installation.Maintenance agreement for system health checks and software updates priced separately.
Posted Date
Oct 22, 2025
Due Date
Nov 21, 2025
Release: Oct 22, 2025
JBWS Safety, Support & Solutions For Abuse
Close: Nov 21, 2025
Furnish and install exterior security camera systems for two of our buildings. The purpose of this RFP is to enhance perimeter security, deter unauthorized access, and enable high-quality video monitoring and recording for safety and liability purposes. 2. Project Overview The selected vendor will be responsible for: Conducting a site assessment of both buildings. Current system has 22 cameras for one building, and 12 for the other. Each building has a dedicated DVR.Recommending appropriate camera models, quantities, and placement (hard-wired or wifi based on recommendation). Providing and installing all necessary hardware and software.Ensuring system integration with existing or new Network Video Recorder (NVR) or cloud infrastructure.Training staff on system usage and maintenance.Offering warranty and possibly ongoing technical support. 3. Scope of Work 3.1 Site Assessment On-site inspection of exterior perimeters.Identification of high-risk areas (entry/exit points, parking lots, blind spots, etc.). 3.2 Camera Specifications Weatherproof (IP66 or higher) and vandal-resistant housing.High-definition resolution (1080p minimum). Infrared night vision (at least 100ft range).Wide dynamic range (WDR) for varied lighting conditions. Motion detection and smart alerts (preferred). Power over Ethernet (PoE) or wireless options with backup power (wired preferred). 3.3 Installation Mounting of cameras at recommended locations.Running cables, power, and networking connections as needed.Ensuring proper system configuration for monitoring and recording. 3.4 Recording and Monitoring Minimum 30-day video storage capacity.Motion activation settings for certain or all cameras.Remote access capabilities (mobile, desktop).User-friendly interface for live view, playback, and export of footage. 3.5 Training and Documentation Basic training for designated personnel.Documentation including camera map, user guides, warranty information, and support contacts. 3.6 Warranty and Support Required warranty on hardware and installation.Maintenance agreement for system health checks and software updates priced separately.
AvailableCity of Ames
Seeking proposals from qualified Contractors to provide and install interior security cameras at the Community Center.
Posted Date
Nov 3, 2025
Due Date
Nov 24, 2025
Release: Nov 3, 2025
City of Ames
Close: Nov 24, 2025
Seeking proposals from qualified Contractors to provide and install interior security cameras at the Community Center.
AvailableTransportation Research Board
The objective of this research is to develop a guide for transportation agencies on managing and sharing access to TMS video. The research will identify current practices, challenges, unintended consequences, and opportunities for improvement.
Posted Date
Nov 10, 2025
Due Date
Jan 7, 2026
Release: Nov 10, 2025
Transportation Research Board
Close: Jan 7, 2026
The objective of this research is to develop a guide for transportation agencies on managing and sharing access to TMS video. The research will identify current practices, challenges, unintended consequences, and opportunities for improvement.
AvailableStark County Metropolitan Housing Authority
Provide security camera installation and maintenance.
Posted Date
-
Due Date
Dec 3, 2025
Release: -
Stark County Metropolitan Housing Authority
Close: Dec 3, 2025
Provide security camera installation and maintenance.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis