Retrieving RFP details
Release
Close
City of Daytona Beach
Work includes 2 EA sediment and erosion control - curb inlet protection; 340 LF turbidity barrier installation & maintenance. F&i temporary signage per permit; 1 LS implement and maintain a maintenance and traffic plan for park visitors and to secure work zone; 1 LS clearing and grubbing as shown on the demolition plan; 12 EA piling (furnish and install 12" sq prestressed concrete 40' pile to plan specified elevation, includes installation of pile cap); 28 EA piling (furnish & install 8" dia, 20' syp marine grade treated timber pile, to meet astm d25, includes 0.03" pile wrap). See outside link.
Seabreeze Park - Boat Ramp and Dock Replacement - *RE-BID**
zip
City of Annapolis
Work includes, task 1: installation of a timber ramp, floating dock, and aluminum gangway at the end of 6th street at back creek and task 2: removal of existing boat launch and bollards, performance of site work, installation of a floating dock and kayak launch, and construction of a reinforced concrete boat ramp and imbricated rock walls.
Colorado Parks and Wildlife
Work includes construction dewatering, 7,200 SF of furnish and place 6-inch reinforced concrete overlay on boat ramp, 1,800 SF of furnish and place 6-inch reinforced concrete overlay on boat ramp, 7,000 SF of perform cold weather concrete heating.
City of Winchester
DESIGN/BUILD of a restroom building near the city park boat ramp.
Release
Sep 11, 2025
Close
Nov 18, 2025