Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Bowbells Public School District 14
Re-roof the area over the elementary section of the school and the high school section of the building.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Meriden
Remedy and repair water penetration with the library's roof.
Posted Date
Aug 21, 2025
Due Date
Jan 6, 2026
Release: Aug 21, 2025
City of Meriden
Close: Jan 6, 2026
Remedy and repair water penetration with the library's roof.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Oconee County
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Oconee County
Close: Dec 18, 2025
Installing new flute fill insulation/TPO roofing system with contour ribs over existing standing seam metal roof. The civic center has a roof area of approximately 28,972 square feet. This project also includes removal of a skylight and in-fill with wood framing. An existing gas exhaust flue located at northeast end of roof will be removed. A new exhaust flue will be installed at the mechanical room and exit through the exterior wall. Existing lightning protection will be removed and reinstalled.
AvailableYes Prep Public Schools Inc
Re-Roof replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 8, 2025
Release: Nov 17, 2025
Yes Prep Public Schools Inc
Close: Dec 8, 2025
Re-Roof replacement.
AvailableRegional School Unit 21
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
Posted Date
-
Due Date
Jan 19, 2026
Regional School Unit 21
Close: Jan 19, 2026
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →