Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction plans for bridge no. 28561 and approach grading.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project includes approx. 150 CU YD of quarry run riprap; 220 LF of 72" CS pipe culvert ;318 LF of 10 X 9 pre conc box culv end section type III ; 1,100 LF of remove fence ;18,156 CU YD of excavation -common ;1 LS of mobilization. See outside link.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Project includes approx. 150 CU YD of quarry run riprap; 220 LF of 72" CS pipe culvert ;318 LF of 10 X 9 pre conc box culv end section type III ; 1,100 LF of remove fence ;18,156 CU YD of excavation -common ;1 LS of mobilization. See outside link.
Premium
Access the largest public sector contact database
Cottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Cottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
AvailableCottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Cottonwood County, Minnesota is soliciting bids for State Aid Project (SAP) 017-605-028 to replace Bridge No. 5990 with new Bridge No. 17540 over the Des Moines River on CSAH 5 near Windom. The work includes removing the existing structure, constructing a new bridge, approach grading, full-depth reclamation, new bituminous surfacing, traffic control/detour management, and erosion and sediment control. Bids are due January 16, 2026 at 4:00 PM local time via the ConneX/BidVault system, with construction planned from May 1, 2026 to September 15, 2026.
AvailableConstruction of Bridge No.56J36 and Approach Grading.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Construction of Bridge No.56J36 and Approach Grading.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis