City of Branson
This project includes quantities for approx. 5,783 LF of sanitary sewer lining in various sizes of cured-in-place pipe lining (CIPP) and the rehabilitation and restoration of structural integrity of 0 manholes.
City of Buffalo
Work includes approx 140 LF of 6" CIPP sanitary sewer lining; 7,445 LF of 8" CIPP sanitary sewer lining; 100 EA reinstate sanitary sewer service; 1,485 LF 10" CIPP sanitary sewer lining; 20 EA CIPP lateral connection liner; See outside link.
Montecito Sanitary District
The Project entails pipeline rehabilitation of approx. 6,020 LF of 21" diameter vitrified clay pipeline (VCP) and 335 LF of 8" diameter VCP via cured-in-place-pipeline (CIPP); and manhole rehabilitation via epoxy coating.
Jersey City Municipal Utilities Authority
The Contractor shall respond to sewer lining repairs as directed by the Authority as needed. The contract is intended to provide the Owner with a sewer lining program capable of being implemented to repair various segments of the combined sewer system. In general, the projects implemented under this contract will be CIPP lining repairs of sewers ranging in diameter size from 8-inch to 96-Inch and at various depths depending on existing conditions.
Montecito Sanitary District
Work includes approx. 5,227 LF of pre-rehabilitation sewer main cleaning-flushing (remaining pipelines); 5,227 LF of pre-rehabilitation sewer main CCTV inspection (Remaining Pipelines); 5,227 LF of post-rehabilitation CCTV inspection (remaining pipelines); 1,129 LF of pre-rehabilitation sewer main cleaning-flushing (MH M9M51 to M9M48); 1,129 LF of pre-rehabilitation sewer main CCTV inspection (MH M9M51 to M9M48); 1,129 LF of post-rehabilitation CCTV inspection (MH M9M51 to M9M48); 1,129 LF of rehabilitate 21" sanitary sewer pipe (MH M9M51 to M9M48); 4,890 LF of rehabilitate 21" sanitary sewer pipe (Remaining Pipelines); 337 LF of Rehabilitate 8" sanitary sewer pipe; 291 VF of rehabilitate and line existing 48" manhole (remaining manholes); 57 VF of rehabilitate and line existing 48" manhole (M9M48 through M9M51); see outside link for more details.
Release
Sep 25, 2025
Close
Oct 28, 2025