Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Douglas County Sanitary And Improvement District 528
Approx 694 SY Repair Pavement - Large Area (Type OPW 4000); 472 SY Repair Pavement - Small Area (Type OPW 4000); 1,299 LF Saw Cut Existing Pavement - Full Depth; 25 TON Remove and Replace Faulty Subgrade; 1 EA Adjust Manhole to Grade; etc.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Sarpy County Sanitary And Improvement District 225
Approx 1,167 SY Repair Pavement - Large Area (Type OPW 4000); 316 SY Repair Pavement - Small Area (Type OPW 4000); 1,659 LF Saw Cut Existing Pavement - Full Depth; 25 ton Remove and Replace Faulty Subgrade; etc.
Posted Date
Nov 6, 2025
Due Date
Nov 20, 2025
Release: Nov 6, 2025
Sarpy County Sanitary And Improvement District 225
Close: Nov 20, 2025
Approx 1,167 SY Repair Pavement - Large Area (Type OPW 4000); 316 SY Repair Pavement - Small Area (Type OPW 4000); 1,659 LF Saw Cut Existing Pavement - Full Depth; 25 ton Remove and Replace Faulty Subgrade; etc.
AvailableCity of McGregor
Reconstruction of sanitary sewer, watermain, services, storm sewer and roadways associated with the project. The roadway reconstruction includes aggregate base course, curb & gutter, brick surfacing, HMA and PCC pavement tie-ins, reinforced concrete special retaining walls (a street), lawn & sidewalk restoration work, and erosion control.
Posted Date
Oct 15, 2025
Due Date
Nov 18, 2025
Release: Oct 15, 2025
City of McGregor
Close: Nov 18, 2025
Reconstruction of sanitary sewer, watermain, services, storm sewer and roadways associated with the project. The roadway reconstruction includes aggregate base course, curb & gutter, brick surfacing, HMA and PCC pavement tie-ins, reinforced concrete special retaining walls (a street), lawn & sidewalk restoration work, and erosion control.
Borough of Palmyra
On call contractor for miscellaneous road, drainage, & sanitary sewer reconstruction reconstruction in the borough.
Posted Date
Oct 17, 2025
Due Date
Dec 9, 2025
Release: Oct 17, 2025
Borough of Palmyra
Close: Dec 9, 2025
On call contractor for miscellaneous road, drainage, & sanitary sewer reconstruction reconstruction in the borough.
AvailableCity of Creston
Excavation, Class 10 - 570 CY; Subgrade Preparation (12β Thick) - 2,846 SY; Granular Subbase, Modified Subbase, 6β Thick - 2,846 SY, Compaction Testing - 1 LS; Trench Compaction Testing - 1 LS; Storm Sewer, Trenched, 15β - 106 LF; Pipe Culvert, Trenched, 18β - 35 LF; Removal of Storm Sewer.
Posted Date
Nov 5, 2025
Due Date
Dec 10, 2025
Release: Nov 5, 2025
City of Creston
Close: Dec 10, 2025
Excavation, Class 10 - 570 CY; Subgrade Preparation (12β Thick) - 2,846 SY; Granular Subbase, Modified Subbase, 6β Thick - 2,846 SY, Compaction Testing - 1 LS; Trench Compaction Testing - 1 LS; Storm Sewer, Trenched, 15β - 106 LF; Pipe Culvert, Trenched, 18β - 35 LF; Removal of Storm Sewer.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis