Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Connecticut State Contracting Standards Board
Project scope includes but is not limited to the following: complete demolition of existing sally port wall and footing; sawcutting and removal of existing concrete pavement; construction of new sally port walls and footings; construction of new automated sliding gate; installation of new power and control wiring; replacement of existing concrete pavement.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Wisconsin Department of Administration
Work consists of the replacement of the east gate systems in their entirety. The new gate1 will include a seven-foot-tall steel fence.
Posted Date
Nov 21, 2025
Due Date
Jan 8, 2026
Release: Nov 21, 2025
Wisconsin Department of Administration
Close: Jan 8, 2026
Work consists of the replacement of the east gate systems in their entirety. The new gate1 will include a seven-foot-tall steel fence.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Miami-Dade County
Provide all labor, equipment and materials to demolish the existing grease interceptor at MIA Gate D15 and replace it with a new hydromechanical grease interceptor, solids separator, sampling port, and associated electrical and plumbing work, including pavement restoration. Issued by the Miami-Dade Aviation Department as an RPQ, the solicitation includes mandatory pre-bid conference call requirements, licensing and qualification requirements, and instructions to refer to the RPQ and plans for full scope and submission details.
Posted Date
Nov 13, 2025
Due Date
Dec 17, 2025
Release: Nov 13, 2025
Miami-Dade County
Close: Dec 17, 2025
Provide all labor, equipment and materials to demolish the existing grease interceptor at MIA Gate D15 and replace it with a new hydromechanical grease interceptor, solids separator, sampling port, and associated electrical and plumbing work, including pavement restoration. Issued by the Miami-Dade Aviation Department as an RPQ, the solicitation includes mandatory pre-bid conference call requirements, licensing and qualification requirements, and instructions to refer to the RPQ and plans for full scope and submission details.
AvailableVillage of North Palm Beach
The Village of North Palm Beach is soliciting bids for removal and reconstruction of approximately 3,710 linear feet of 8-foot concrete wall (East Alley Wall Replacement). The ITB includes construction plans and a geotechnical report; bids are due December 18, 2025 at 2:00 PM Eastern with a non-mandatory pre-bid meeting on December 2, 2025 at 10:30 AM Eastern.
Posted Date
Nov 12, 2025
Due Date
Dec 18, 2025
Release: Nov 12, 2025
Village of North Palm Beach
Close: Dec 18, 2025
The Village of North Palm Beach is soliciting bids for removal and reconstruction of approximately 3,710 linear feet of 8-foot concrete wall (East Alley Wall Replacement). The ITB includes construction plans and a geotechnical report; bids are due December 18, 2025 at 2:00 PM Eastern with a non-mandatory pre-bid meeting on December 2, 2025 at 10:30 AM Eastern.
AvailablePublic Buildings Service
Intake gate replacement - Unit 3project.
Posted Date
Oct 24, 2025
Due Date
Dec 31, 2025
Release: Oct 24, 2025
Public Buildings Service
Close: Dec 31, 2025
Intake gate replacement - Unit 3project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →