Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Carolina Department of Transportation
Work includes clearing and grubbing within right of way, removal of structures and obstructions, removal and disposal of existing asphalt pavement 2,193.000 SY, removal of exist guardrail 1,733.000 LF, removal and disposal of existing bridge, unclassified excavation 2,453.000 CY, borrow excavation 26,267.000 CY, borrow pit set-up, geotextile, stabilization 600.000 SY, geogrid reinforcement (uniaxial) 6,940.000 SY, structure excavation for retaining wall 930.000 CY, no 57 stone for backfill 1,575.000 Ton, stone bridge lift material 1,491.000 Ton. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
South Carolina Department of Transportation
The work consist of approx 1,360 LF prestressed concrete beam (type iii); 508 LF 74" prestressed concrete bulb tee beam; 480 LF steel h bearing piling (hp14 x 73); 1,733 LF removal of existing bridge; 26,267 CY borrow excavation.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
South Carolina Department of Transportation
Close: Dec 9, 2025
The work consist of approx 1,360 LF prestressed concrete beam (type iii); 508 LF 74" prestressed concrete bulb tee beam; 480 LF steel h bearing piling (hp14 x 73); 1,733 LF removal of existing bridge; 26,267 CY borrow excavation.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
South Carolina Department of Disabilities and Special Needs
Roofing Supplies for Tyger River
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
South Carolina Department of Disabilities and Special Needs
Close: Dec 9, 2025
Roofing Supplies for Tyger River
AvailableSouth Carolina Department of Transportation
Work includes small public water relocation no 1, clearing and grubbing within right of way, removal and disposal of existing pavement 235.000 SY, removal of exist guardrail 120.000 LF, removal and disposal of existing bridge, unclassified excavation 1,077.000 CY, borrow excavation 9,114. 000 CY, muck excavation 50. 000 CY, geotextile, separation 246. 000 SY, geogrid reinforcement (uniaxial) 1,865.000 SY geogrid stabilization 246.000 SY, stone bridge lift material 200.000 Ton, fine grading 5,084.000 SY, flowable fill 40.000 CY, maintenance stone 63.000 Ton. See attached file.
Posted Date
Nov 4, 2025
Due Date
Dec 9, 2025
Release: Nov 4, 2025
South Carolina Department of Transportation
Close: Dec 9, 2025
Work includes small public water relocation no 1, clearing and grubbing within right of way, removal and disposal of existing pavement 235.000 SY, removal of exist guardrail 120.000 LF, removal and disposal of existing bridge, unclassified excavation 1,077.000 CY, borrow excavation 9,114. 000 CY, muck excavation 50. 000 CY, geotextile, separation 246. 000 SY, geogrid reinforcement (uniaxial) 1,865.000 SY geogrid stabilization 246.000 SY, stone bridge lift material 200.000 Ton, fine grading 5,084.000 SY, flowable fill 40.000 CY, maintenance stone 63.000 Ton. See attached file.
AvailableMonroe County
Wiler road bridge replacement over west creek.
Posted Date
Nov 14, 2025
Due Date
Dec 19, 2025
Release: Nov 14, 2025
Monroe County
Close: Dec 19, 2025
Wiler road bridge replacement over west creek.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →