Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Santa Rosa
The project will construct a 14.5-foot wide ADA compliant class i bicycle & pedestrian overcrossing over us-101, including a 5-foot wide walking lane and 8-foot wide bike path. The project will close a significant gap in the east-west transportation network for pedestrians and bicyclists.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Texas Department of Transportation
Work includes bicycle and pedestrian improvements.
Posted Date
Nov 5, 2025
Due Date
Dec 2, 2025
Release: Nov 5, 2025
Texas Department of Transportation
Close: Dec 2, 2025
Work includes bicycle and pedestrian improvements.
AvailableContra Costa County
Contra Costa County is soliciting a qualified contractor to conduct a 28-month study of enhanced bicycle and pedestrian improvements in the Bay Point area to improve safety and accessibility. The scope includes analysis of existing infrastructure, stakeholder and community engagement, and delivery of recommendations and a comprehensive final report.
Posted Date
Nov 7, 2025
Due Date
Dec 12, 2025
Release: Nov 7, 2025
Contra Costa County
Close: Dec 12, 2025
Contra Costa County is soliciting a qualified contractor to conduct a 28-month study of enhanced bicycle and pedestrian improvements in the Bay Point area to improve safety and accessibility. The scope includes analysis of existing infrastructure, stakeholder and community engagement, and delivery of recommendations and a comprehensive final report.
AvailableContra Costa County
Contra Costa County's Department of Conservation and Development seeks a qualified firm to perform the San Pablo Avenue Enhanced Bicycle and Pedestrian Gap Closure Study, including data collection, stakeholder engagement, conceptual design alternatives, cost estimates, and preparation of draft and final study documents. The selected firm will conduct site visits, develop preliminary engineering-level plans and cost estimates, and present findings to stakeholders with emphasis on safety, connectivity, and accessibility.
Posted Date
Oct 21, 2025
Due Date
Nov 21, 2025
Release: Oct 21, 2025
Contra Costa County
Close: Nov 21, 2025
Contra Costa County's Department of Conservation and Development seeks a qualified firm to perform the San Pablo Avenue Enhanced Bicycle and Pedestrian Gap Closure Study, including data collection, stakeholder engagement, conceptual design alternatives, cost estimates, and preparation of draft and final study documents. The selected firm will conduct site visits, develop preliminary engineering-level plans and cost estimates, and present findings to stakeholders with emphasis on safety, connectivity, and accessibility.
Massachusetts Department of Transportation
The Massachusetts Department of Transportation seeks Statements of Qualifications from Design-Build teams to design and construct a new pedestrian and bicycle bridge over the Mystic River, including highway and bridge design, landscaping, and stakeholder coordination. The project is estimated at roughly $53,000,000 (budget estimate $48Mβ$58M) and requires the selected Design-Builder to deliver final stamped design and perform construction per regulatory and permitting requirements.
Posted Date
Jul 9, 2025
Due Date
Dec 16, 2025
Release: Jul 9, 2025
Massachusetts Department of Transportation
Close: Dec 16, 2025
The Massachusetts Department of Transportation seeks Statements of Qualifications from Design-Build teams to design and construct a new pedestrian and bicycle bridge over the Mystic River, including highway and bridge design, landscaping, and stakeholder coordination. The project is estimated at roughly $53,000,000 (budget estimate $48Mβ$58M) and requires the selected Design-Builder to deliver final stamped design and perform construction per regulatory and permitting requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis