Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
San Francisco Police Department
Project consists of installation of one (1) new rolling steel door, minimum of one (1) year warranty, and the removal and disposal of all old door components. See attached file.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Santa Clara Valley Transportation Authority
Work consist of roll-up door replacement.
Posted Date
Nov 17, 2025
Due Date
Dec 18, 2025
Release: Nov 17, 2025
Santa Clara Valley Transportation Authority
Close: Dec 18, 2025
Work consist of roll-up door replacement.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Santa Clara Valley Water District
Remove existing gates and furnish and install new high-speed roll-up doors at two main campus sites. Work includes demolishing two swing gates and installing a new door for an opening about 20' by 16' with a minimum opening speed of 60" per second, a multi-layer ultraviolet-protected reinforced steel slat curtain, new steel framing, a direct drive motor rated 1 to 2 horsepower, and a NEMA 4X control panel with interior push-button controls and no exterior access, with LiftMaster or equal acceptable.
Posted Date
Nov 10, 2025
Due Date
Dec 15, 2025
Release: Nov 10, 2025
Santa Clara Valley Water District
Close: Dec 15, 2025
Remove existing gates and furnish and install new high-speed roll-up doors at two main campus sites. Work includes demolishing two swing gates and installing a new door for an opening about 20' by 16' with a minimum opening speed of 60" per second, a multi-layer ultraviolet-protected reinforced steel slat curtain, new steel framing, a direct drive motor rated 1 to 2 horsepower, and a NEMA 4X control panel with interior push-button controls and no exterior access, with LiftMaster or equal acceptable.
AvailableCalifornia Department of General Services
Roll-up door maintenance and repair.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
California Department of General Services
Close: Dec 23, 2025
Roll-up door maintenance and repair.
AvailableCalifornia Department of Transportation
Provide roll-up door services.
Posted Date
Nov 25, 2025
Due Date
Dec 16, 2025
Release: Nov 25, 2025
California Department of Transportation
Close: Dec 16, 2025
Provide roll-up door services.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →