Retrieving RFP details
Release
Close
Riverfront Recapture, Inc.
Work consist of installation of erosion controls as necessary to control stormwater runoff, dust, sediment, and debris from exiting the site in accordance with the erosion and sediment control plans. Excavation and regrading of remedial areas. Temporary stockpiling of impacted soils. Excavation of proposed cove area. Filling and regrading of area adjacent to amtrak row. Grading of proposed hill and berm. Establishment of proposed inland wetland enhancement area. Establishment of proposed tidal wetland enhancement area. Restoration of existing inland wetland area. Restoration of existing tidal wetland area. Establishment of pygmyweed benches (grading and transplanting). Transplanting/relocation of select plant and mussel species
Bald Eagle Township
All items to be delivered as requested and may be more or less quantity listed 100 TN 1b aashto no 8 300 TN 2a subbase 100 TN aashto no 57 500 TN 2rc 150 TN r-3 rip rap 150 TN r-4 rip rad 150 TN r-5 rip rap 150 TN r-6 rip rap 150 TN r-7 rip rap 15- TN r-8 rip rap 100 TN railroad ballast #3 500 TN anti-skid.
City of Montgomery
Project will add a new outdoor venue within a part of Downtown Montgomery’s iconic Riverfront Park. The Project includes a 400sf wood-framed stage platform with ramp and stairs and composite decking surfaces, a 600sf structural steel canopy with TPO roofing and wood soffit, and LED stage lighting. Minimal site work will be required.
New Jersey Economic Development Authority
Property's redevelopment that may include, but not be limited to: Including the former Prison Site by itself or the Property (former Prison Site and former Weeks Marine Site) in a redevelopment project in which NJEDA is involved in the redevelopment or has an equity stake. Purchase of the former Prison Site by itself or the Property (former Prison Site and former Weeks Marine Site). Entering into a ground lease for the redevelopment of the former Prison Site by itself or the Property (former Prison Site and former Weeks Marine Site).
Release
Nov 24, 2025
Close
Nov 25, 2025