Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Toledo Area Regional Transit Authority
Toledo Area Regional Transit Authority (TARTA) issued an RFI requesting information and preliminary cost estimates for procurement and installation of a natural gas generator system to provide full backup power to TARTA’s main facility, with consideration for future scalability. This is an informational RFI (not a grant or a commitment to procure); it was posted Nov 20, 2025 and responses are due Dec 12, 2025 at 3:00 PM Eastern.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
West Baton Rouge Parish
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
Posted Date
Nov 13, 2025
Due Date
Dec 2, 2025
Release: Nov 13, 2025
West Baton Rouge Parish
Close: Dec 2, 2025
Provide one (1) new standby natural gas generator system with automatic transfer switch (ATS) to include the generator, connection to electrical controls, connection to the natural gas system, testing, adjusting, and start-up.
AvailableBaldwin County
Baldwin County Commission seeks bids for the purchase and installation of a 96 kW natural gas generator with a 400 AMP automatic transfer switch at the Foley Satellite Courthouse. The project includes removal of the existing diesel generator and installation of the new system, requiring compliance with specific regulatory standards and a one-year warranty on workmanship and materials.
Posted Date
-
Due Date
Dec 8, 2025
Baldwin County
Close: Dec 8, 2025
Baldwin County Commission seeks bids for the purchase and installation of a 96 kW natural gas generator with a 400 AMP automatic transfer switch at the Foley Satellite Courthouse. The project includes removal of the existing diesel generator and installation of the new system, requiring compliance with specific regulatory standards and a one-year warranty on workmanship and materials.
AvailableBaldwin County
Purchase and installation of one (1) new 300 kw natural gas generator
Posted Date
Nov 7, 2025
Due Date
Dec 4, 2025
Release: Nov 7, 2025
Baldwin County
Close: Dec 4, 2025
Purchase and installation of one (1) new 300 kw natural gas generator
AvailableBaldwin County
Purchase and installation of one (1) new 150 kw natural gas generator.
Posted Date
Nov 7, 2025
Due Date
Dec 5, 2025
Release: Nov 7, 2025
Baldwin County
Close: Dec 5, 2025
Purchase and installation of one (1) new 150 kw natural gas generator.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis