Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Sandy
Construct new CMU building housing the chlorine system and natural gas generator, reservoir mixing system, driveway improvements, landscaping, and transfer pump station improvements includes 235 CY general excavation, 20 LF furnish and install 12" class 52 ductile iron pipe restrained with class B trench backfill, 32 LF furnish and install 4" building drain pipe, 75 LF furnish and install 6" storm drain pipe, 1 EA 96" chlorine manhole, 1 LS reservoir hydrodynamic mixing system, 110 LF 3" PVC conduit.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Byron
Work includes waste water treatment plant improvements.
Posted Date
Nov 24, 2025
Due Date
Jan 27, 2026
Release: Nov 24, 2025
City of Byron
Close: Jan 27, 2026
Work includes waste water treatment plant improvements.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Smithland
Purchase and installation of two new filters in the filtration / U.V. building, improvements to the influent pump station, and related appurtenances on the wastewater treatment plant site.
Posted Date
Dec 1, 2025
Due Date
Dec 16, 2025
Release: Dec 1, 2025
City of Smithland
Close: Dec 16, 2025
Purchase and installation of two new filters in the filtration / U.V. building, improvements to the influent pump station, and related appurtenances on the wastewater treatment plant site.
AvailableWestern Berks Water Authority
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
Posted Date
Nov 6, 2025
Due Date
Jan 8, 2026
Release: Nov 6, 2025
Western Berks Water Authority
Close: Jan 8, 2026
Water treatment plant improvements including, but not limited to, the construction of a second clear well, complete filter reconstruction, electrical system upgrades, a new backwash waste sump and pump station, repurposing the existing high service pump station, a new high service pumpstation and chemical building, existing chemical feed system improvements, sludge handling/processing improvements, stormwater system updates, and miscellaneous civil/site improvements.
AvailableCity of Avon Park
Work includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
Posted Date
Nov 28, 2025
Due Date
Dec 22, 2025
Release: Nov 28, 2025
City of Avon Park
Close: Dec 22, 2025
Work includes wastewater treatment plant improvements, fine screens, process instrumentation, process mixers, fine bubble diffusers, aeration piping and equipment, process blowers, process pumps, membrane system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →