Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Banks County
Approximately 0.84 miles of patching, recycled asphaltic concrete resurfacing, striping and shoulder filling on road. Work includes approx. 1 LS grading complete, 730 TN recycled asphalt concrete patching, 700 TN recycled asphalt concrete 9.5MM superpave, 1,095 Gal tack coat, 1.68 LM 5" yellow solid traffic stripe.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
County of St. Louis
Road resurfacing consists of pavement repairs, pavement milling, superpave asphaltic concrete overlay, replacement of side street approaches, curb ramp improvements, and traffic signal upgrades
Posted Date
Oct 20, 2025
Due Date
Nov 19, 2025
Release: Oct 20, 2025
County of St. Louis
Close: Nov 19, 2025
Road resurfacing consists of pavement repairs, pavement milling, superpave asphaltic concrete overlay, replacement of side street approaches, curb ramp improvements, and traffic signal upgrades
AvailableLee County
Work includes to be milled down 1.5" and resurfaced with 165 lbs/SY of 12.5 mm overlay except where there is no curb patching road 865 tons, mill joint 1 EA, mill 2.5" 10,422 SY, mill 1.5" 82,620 SY, mill and pave around manhole 19 EA, mill and pave around water valve 6 EA, remove and replace 36" curb and gutter 122 LF, reset catch basin top 1 EA, replace grate inlet and hood 2 EA, 9.5 mm leveling @ 85 lbs/SY 250 tons, 12.5mm asphalt pavement overlay @ 165 lbs/SY 8,615 tons, reinstall 40'x6' traffic loop detector 11 EA, reinstall 6'x6' traffic loop detector 10 EA. See attached file.
Posted Date
Oct 29, 2025
Due Date
Dec 2, 2025
Release: Oct 29, 2025
Lee County
Close: Dec 2, 2025
Work includes to be milled down 1.5" and resurfaced with 165 lbs/SY of 12.5 mm overlay except where there is no curb patching road 865 tons, mill joint 1 EA, mill 2.5" 10,422 SY, mill 1.5" 82,620 SY, mill and pave around manhole 19 EA, mill and pave around water valve 6 EA, remove and replace 36" curb and gutter 122 LF, reset catch basin top 1 EA, replace grate inlet and hood 2 EA, 9.5 mm leveling @ 85 lbs/SY 250 tons, 12.5mm asphalt pavement overlay @ 165 lbs/SY 8,615 tons, reinstall 40'x6' traffic loop detector 11 EA, reinstall 6'x6' traffic loop detector 10 EA. See attached file.
AvailableLorain County
Road resurfacing project.
Posted Date
Nov 12, 2025
Due Date
Dec 9, 2025
Release: Nov 12, 2025
Lorain County
Close: Dec 9, 2025
Road resurfacing project.
AvailableLorain County
The work consist of resurfacing Chestnut Ridge Rd.
Posted Date
-
Due Date
Dec 9, 2025
Release: -
Lorain County
Close: Dec 9, 2025
The work consist of resurfacing Chestnut Ridge Rd.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis